My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-03-18_REVISION - M1977526
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977526
>
2019-03-18_REVISION - M1977526
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 5:44:32 AM
Creation date
3/18/2019 4:17:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977526
IBM Index Class Name
REVISION
Doc Date
3/18/2019
Doc Name
Request for Technical Revision
From
Albert Frei & Sons
To
DRMS
Type & Sequence
TR5
Email Name
JLE
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P.O. BOX 700 <br /> go HENDERSON, CO 80640 <br /> ALBERT FREI & SONS (303)289-1837 <br /> (303)289-2865 FAX <br /> March 13 , 2019 <br /> Mr. Jared Ebert <br /> Division of Reclamation, Mining & Safety <br /> 1313 Sherman St # 215 <br /> Denver, CO 80203 <br /> Dear Mr. Ebert : <br /> RE: Worthing Pit, Permit # M-1977-526 <br /> Technical Revision #05 <br /> This Technical Revision is a formal request to obtain an <br /> extension for completing reclamation on the North Expansion Area of <br /> the Worthing Pit . The Division determined that mining ended on or <br /> around March 12 , 2014 and reclamation should be completed by March <br /> 12 , 2019 . In November 2017 we believed reclamation was proceeding <br /> as planned and the backfilling and seeding would be complete on <br /> time. We missed this timetable due to the lack of material . <br /> The only part of the North Expansion area needing reclaiming <br /> is the old tailings, pond area in the northeast quadrant of the <br /> area, 12 . 70± acres . In approved plans, this area is to be filled <br /> back to an level close tho the neighboring property and to allow a <br /> level graded along Brighton Road. The material was to come from <br /> other parts of the permit area if the northern ponds were developed <br /> as a Water Storage Facility. This was not done, so clean dirt <br /> being delivered to the Inert Fill Facility is being diverted to the <br /> old tailing pond area to backfill it . This is taking place still <br /> because the clean dirt needed has not been available in sufficient <br /> quantities to reach the final grade by March 2019 . At this time we <br /> have approximately 750 of the fill needed to reach final grade and <br /> find it necessary to ask for 2 additional years to complete <br /> reclamation on the old silt pond area shown on the attached map. <br /> We believe that by March 12 , 2021 the final grading, shaping and <br /> seeding can be completed. <br /> The Technical Revision form and a check to cover the <br /> Technical Revision fee of $216 . 00 are attached. If you have any <br /> questions or require more information please call me at the above <br /> number or Steve O'Brian of Environment, Inc. at 303-423-7297 . <br /> Sincerely, <br /> Pen�f <br /> Secretary <br /> cc Environment, Inc. <br /> file <br /> enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.