My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-03-18_REVISION - M2010036
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2010036
>
2019-03-18_REVISION - M2010036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 1:08:25 PM
Creation date
3/18/2019 4:00:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010036
IBM Index Class Name
REVISION
Doc Date
3/18/2019
Doc Name
Adequacy Review Response
From
Randy Schafer
To
DRMS
Type & Sequence
AM1
Email Name
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised 2/18/19 Amended Ensminger Pit#2 Calculation Notes <br /> Calclulations are based on work to a maximum of 83.9 affected acres which should be the maximum disturbed. <br /> Of the 83.9 acres, 11.8 actually are creekbed which will not be reclaimed, leaving 72.1 net acres. <br /> Backfilling and-grading <br /> 12,790 ft. Perimeter involved x 60 ft. (slope distance) = 767,400 sq.ft. <br /> 767,400 sq.ft. x 0.42 ft. (depth) = 322,308 cu.ft. <br /> 322,308 cu.ft. / 27 cu.ft. = 11,937 CY <br /> 72.1 Ac. x 43,560 sq.ft.Area in Acre = 3,140,676 sq.ft. <br /> Area previously calculated + 767,400 sq.ft. <br /> 3,908,076 sq.ft. <br /> Depth x 1 ft. <br /> 3,908,076 cu.ft. <br /> 3,908,076 cu.ft. / 27 cu.ft. = 144,744 CY <br /> + 11,937 CY <br /> Total Cubic Yards to move 156,681 CY <br /> Dozer will move 795 CY/Hour <br /> 156,681 CY / 795 CY/hour = 197.1 Hrs. <br /> Replace Topsoil <br /> 0.42 ft. (inches of. topsoil) x 3,140,676 = 1,319,084 cu.ft. <br /> (Total Area) <br /> 1,319,084 cu.ft. / 27 cu.ft. = 48,855 CY <br /> Replace Overburdern (minimum anticipated) <br /> 0.5 ft. (approx. feet of x 3,140,676 = 1,570,338 cu.ft. <br /> overburden) (Total Area) <br /> 1,570,338 cu.ft. / 27 cu.ft. = 58,161 CY <br /> Speedy Mover will move 117 CY/Hour <br /> 48,855 CY <br /> 58,161 CY <br /> 107,016 CY / 117 CY/Hour = 914.7 Hrs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.