Laserfiche WebLink
E. Other Disturbances (please describe) <br /> None <br /> F. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to <br /> store. <br /> Gas :n vehic'e tanks. Daesel for veh*e'es ns contaaned an 500 gallon above ground (elev <br /> G. New Roads: <br /> Length (ft): Width (ft): <br /> Significantly <br /> Upgraded Roads Length (ft): Width (ft): <br /> Are culverts or other crossings proposed? If so,please describe: <br /> NoA1� <br /> . <br /> H. Total project area to be disturbed (acres) 0.0 <br /> I. Describe the equipment to be used for the prospecting operations: <br /> VLD-3060 track mounted doreeteona' drilling rig supplied by RE! Drilling, powered by line pe <br /> Form 2—Public File Page 7 of 14 <br />