Laserfiche WebLink
RECORD OF BOREHOLE MW-5 SHEET 2of 2 ' <br /> PROJECT: Boettcher Limestone Quarry DRILL METHOD: Hollow Stem Auger COORDINATES: DEPTH W.L.: 39.5 ft <br /> PROJECT NUMBER: 103-81640A DATE/TIME STARTED: 12/12/2012 N:1,489,893.21 E:3,097,213.94 ELEVATION W.L.: 5234.5 ft ' <br /> LOCATION: Laporte,CO DRILLED DEPTH: 60.0 ft GS ELEVATION: 5274.0 ft INCLINATION:-90 <br /> SOIL PROFILE SAMPLE INFORMATION <br /> O ui ui Lu , <br /> a 0 o a r 2 a s BLOWS N AETsc REMARKS GAMMA <br /> o✓ w LITHOLOGY DESCRIPTION O ¢o z a� (ft) <br /> per 6 in (cps) <br /> (n <br /> W <br /> 100 200 30 , <br /> 37.4-39.0ft <br /> (ML)clayey SILT,low plasticity,trace fine 40.0-42.0 S-21 SS 4-5-3-7 8 2 <br /> sand,dark yellow brown,moist,firm,mottled 2.00 <br /> with pale red,dark yellowish-orange and dark <br /> gray <br /> 39.0-40.011 42.0-44.0 S-22 SS 4-8-64 14 1-50 ' <br /> (ML)SILT,dark gray,wet,calcareous 2'00 <br /> 230 40.0-41.1 ft <br /> (ML)SILT,medium plasticity,trace clay,trace 1�4 <br /> q fine sand,trace fine gravel,dark yellow 44.0-46.0 S-23 SS 4-5-8-6 13 200 <br /> brown,wet,firm . <br /> to stiff,saturated and flowing , <br /> 41.1-42.Oft <br /> (ML)SILT,dark gray,wet,calcareous ]94 <br /> 46.0 48.0 S-24 SS 0-4-4-5 8 2.00 <br /> 42.0-54.5ft <br /> (ML)SILT,low plasticity,some fine gravel, <br /> trace clay,trace fine sand,brown black and ' <br /> 225 brown gray,wet,soft to firm,calcareous 48.0-50.0 S-25 SS 4-5-4-4 9 1.30 <br /> 2.00 <br /> 50.0-52.0 S-26 SS 5-4-5-6 9 ]]S! <br /> 2.00 ' <br /> 52.0-54.0 S-27 SS 3-4-8-4 12 im <br /> 2.00 <br /> 220 ' <br /> 54.5-55.8ft IM 54.0-55.8 5-28 SS 3-3-7-50/5.5" 10 ].§4 <br /> 5 (CL-ML)SILTY CLAY,high plasticity,brown 1.80 <br /> gray,moist,soft to fine,calcareous <br /> 56.0-56.4 5-29 SS 50/5" Refusal Q,4Q <br /> 0.40 ' <br /> 58.0-58.2 5-30 SS77Screened <br /> 215 <br /> Borehole discontinued at 60-ft depth. 60.OftHole was air lifted for one hour prior to <br /> settingwell.Yield estimated at about 10 <br /> GPM.2.6'of cuttings fill the bottom. <br /> across water table. <br /> 1 <br /> a <br /> H <br /> O <br /> 0 ,J <br /> _F <br /> S <br /> M <br /> 0I <br /> OI <br /> 0- ' <br /> O <br /> U <br /> O ' <br /> x <br /> (9 <br /> O <br /> J <br /> Q <br /> 0 ' <br /> >F <br /> W <br /> uj <br /> 0 ' <br /> 2 <br /> K <br /> °m DRILLING CONTRACTOR: Precision Sampling LOGGED BY: Krambis <br /> 2 DRILLER: Mclnroy CHECKED BY: A. Hobson Golder <br /> DRILL RIG: CME 55 DATE: Sssocwes <br />