Laserfiche WebLink
<br /> <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br />Jared Polis, Governor | Dan Gibbs, Executive Director | Virginia Brannon, Director <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br /> <br /> <br />March 15, 2019 <br /> <br /> <br />James Stover <br />J.E. Stover & Associates <br />2352 N 7th St, Ste B <br />Grand Junction, CO 81501-8168 <br /> <br /> <br />Re: Coal Ridge No. 1 Mine (Permit No. C-1984-065) <br /> Proposed Decision - Technical Revision No. 22 (TR-22) <br /> Revise Permit Boundary and Ownership <br /> <br /> <br />Dear Mr. Stover: <br /> <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision for <br />Technical Revision No. 22 at the Coal Ridge No. 1 Mine. Notice of the proposed decision will be <br />published in the Glenwood Springs Post Independent as soon as possible. The first publication will <br />initiate the ten (10) day public comment period for the Division's decision. <br /> <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount <br />of Bond Held equals or exceeds the Revised Liability, you need not submit additional bond. <br />However, if the Revised Liability exceeds the Bond Held, please submit additional bond or rider to <br />your existing bond that equals or exceeds the Revised Liability. This Technical Revision must not be <br />implemented until this proposed decision becomes final and until any required increase in bond is <br />submitted to and approved by the Division. <br /> <br />If there are stipulations attached, please sign and return the proposed decision form to the Division. <br /> <br />If you have any questions, please contact me. <br />