My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-03-12_REVISION - C1980004
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980004
>
2019-03-12_REVISION - C1980004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2019 12:20:20 PM
Creation date
3/12/2019 11:06:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Revision
Doc Date
3/12/2019
Doc Name
Midterm Review Response
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
MT8
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES, INC. <br /> 2352 NORTH 7T"STREET,UNIT B <br /> GRAND JUNCTION,COLORADO 81501 <br /> PHONE:(970)245-4101,FAX:(970)242-7908 <br /> MINE ENGINEERING CIVIL ENGINEERING <br /> MINE RECLAMATION CONST. MANAGEMENT <br /> March 6, 2019 <br /> RECEIVED <br /> Clayton Wein MAR 2 2019 <br /> Division of Reclamation, Mining &Safety <br /> 1313 Sherman St., Room 215 DIVISION OF RECLAMATICIN <br /> Denver, CO 80203 MINING AND SAFETY <br /> Re: McClane Canyon Mining LLC, McClane Canyon Mine <br /> MidTerm Permit Review No. 8 <br /> Permit C-1980-004 <br /> Dear Mr. Wein: <br /> The DRMS prepared a midterm review document dated December 28,218 for the McClane <br /> Canyon Mine (MCM). Section IV lists six adequacy questions. On behalf of McClane Canyon <br /> Mining, LLC,following are its responses to the adequacy questions. <br /> 1. DRMS—Please submit an updated officers and directors list for McClane Canyon <br /> Mining, LLC if needed. <br /> MCM—There is one change to Appendix A page 1. Joe Briton is no longer associated <br /> with the McClane Canyon Mine. Revised Appendix A page 1 is enclosed. <br /> 2. DRMS- Please submit updated Section 2.1.3—Production (starting on page 2-3) and <br /> associated table (page 2-4)for production of McClane Mine from 2013—2018. <br /> MCM— Page 2.05-2 was revised to update the anticipated production from the mine. <br /> 3. DRMS—Please submit an updated Figure 2.1-1, if needed,to reflect the actual schedule <br /> up to 2018 and projected schedule for future years. <br /> MCM—The mine plan, Figure 2.1-1, was updated to show the actual mining completed <br /> in 2010. The mining schedule shows quarterly advance for the first year and annual <br /> advance thereafter. There are no dates attached to the schedule. The mining schedule <br /> will begin when mining resumes. The first paragraph on page 2.05-5 was revised to <br /> indicate the Operator has obtained the lease modification. <br />
The URL can be used to link to this page
Your browser does not support the video tag.