Laserfiche WebLink
Introduction <br />The information assembled in this 2018 Annual Hydrology Report (AHR) <br />includes data collected from all water monitoring sites at Hayden Gulch <br />Terminal LLC's (HGT) Hayden Gulch Loadout (CDRMS Permit C-92-081) for <br />the 2018 water year (October 2017 -September 2018). Locations of water <br />monitoring sites are depicted on Figure 1 (Appendix A). <br />In 2011, the tipple was scrapped. Topsoiling and reseeding of the tipple <br />and coal storage areas were also completed in 2011. The office area and <br />the rail line were left in place until 2013 when the offices were <br />reclaimed. The rail line remains. <br />The Tie -Across Haul Road (formerly associated with the Seneca II -W Mine, <br />CDRMS Permit C-82-057) was transferred to the Hayden Gulch Terminal on <br />January 4, 2012. <br />3 <br />