My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-03-07_REVISION - M1987012
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987012
>
2019-03-07_REVISION - M1987012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2021 3:07:16 PM
Creation date
3/8/2019 11:29:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987012
IBM Index Class Name
Revision
Doc Date
3/7/2019
Doc Name
Bond Cost Summary Final
From
DRMS
To
Southway
Type & Sequence
AM2
Email Name
SJM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Totals <br />Site: King Pit Permit Action: AM02 Revised <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 3/5/2019 County: Alamosa <br />User: SJM <br />Agency or organization name: DBMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: M1987012 <br />Abbreviation: None <br />Filename: MO 12-001 <br />Task <br />Form <br />Description Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />002 <br />003 <br />004 <br />006 <br />007 <br />008 <br />Reduce East hi walls in N and S cells DOZER <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />76.40 <br />$20,471 <br />$5,662 <br />$6,364 <br />$34,006 <br />$108,582 <br />$2,637 <br />Reduce north and south hi hwalls in N and S cells DOZER <br />21.13 <br />Rip it floor prior to topsoil replacement GRADER <br />37.60 <br />Re lace 6 inches of to osil over permit area SCRAPERI <br />96.20 <br />Reve etate permit area REVEGE <br />10.00 <br />mob/demob MOBILIZE <br />0.96 <br />SUBTOTALS: <br />242.29 <br />$177,722 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />0.00 <br />Total = <br />$0 <br />Performance bond: <br />0.00 <br />Total = <br />$0 <br />Job superintendent: <br />121.15 <br />Total = <br />$8,850 <br />Profit: <br />10.00 <br />Total = <br />$17,772 <br />TOTAL O & P = <br />$26,622 <br />TOTAL BOND <br />AMOUNT (direct + indirect) = <br />CONTRACT AMOUNT (direct + O & P) <br />$204,344 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />$0 <br />Total = <br />$0 <br />Engineering work and/or contract/bid preparation: <br />0.00 <br />Total = <br />$0 <br />Reclamation management and/or administration: <br />5.00 <br />$10,217 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0 <br />TOTAL INDIRECT COST = <br />$36,839 <br />TOTAL BOND <br />AMOUNT (direct + indirect) = <br />$214,561 <br />
The URL can be used to link to this page
Your browser does not support the video tag.