Laserfiche WebLink
Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for Calendar Year 2018 <br />Bowie No. 1 Mine C1981038 Bowie Resources, LLC <br />Mine Name Pcrmit Number Pcrmittcc <br />P.O. Box 1488, Paonia, CO 81428 <br />Address <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon by the Division. It should include text, <br />discussion, and maps, at a minimum, in addition to any other reclamation monitoring data as required by the approved permit. The location of the <br />acreage reported under each land status category and year of seeding (if applicable) should be clearly identified on a map included with the report. <br />Land Category <br />Last Year's Cumulative Total <br />(from last year's ) <br />s ARR <br />This Calendar Year <br />Cumulative Total <br />Cumulative Total <br />Acres Added (+) <br />Acres Subtracted (-) <br />Acreage in Active <br />O <br />O <br />0 <br />_ <br />0 <br />Mining Areas' <br />99 <br />O <br />0 <br />— <br />99 <br />Category <br />Last Year's Cumulative Total <br />(from last year's ) <br />s ARR <br />This Calendar YearLand <br />Cumulative Total <br />Cumulative Total <br />Acres Added (+) <br />Acres Subtracted (-) <br />Acres Disturbe& <br />156.10 <br />0 <br />0 <br />= <br />156.1 <br />Acres Backfilled and <br />Graded <br />99 <br />O <br />0 <br />— <br />99 <br />Acres Topsoiled <br />91.27 <br />0 <br />0 <br />= <br />91.27 <br />Acreage in Long-term <br />Last Year's Cumulative <br />This Calendar Year <br />Cumulative Total <br />Cumulative Total <br />Facilities' <br />Total <br />21.56 <br />Cumulative Total <br />= <br />21.56 <br />from last ear's ARR) <br />Acres Added (+) Acres Subtracted (-) <br />0 0 <br />= <br />Non -Permanent <br />report loadout & WM ponds <br />p p <br />0 0 <br />= <br />Loadout & ponds <br />Facilities <br />Permanent Facilities <br />O O <br />(permitted) <br />Totals <br />= <br />Acres Seeded <br />(permanent) <br />Last Year's Cumulative Total <br />(from last year's ARR) <br />This Calendar Year <br />Cumulative Total <br />Cumulative Total <br />Acres Added (+) Acres Subtracted (-) <br />9 Years and Less <br />21.56 <br />0 0 <br />= <br />21.56 <br />10 Years and Greater <br />84.41 <br />0 0 <br />= <br />84.41 <br />Totals <br />105.97 <br />0 <br />= <br />105.97 <br />Release <br />Last Year's Cumulative Total <br />s ARR <br />(from last year's ) <br />This Calendar YearBond <br />Cumulative Total <br />Acres Added (+) <br />Acres Subtracted (-) <br />Phase I Released <br />86.01 <br />0 <br />0 <br />= 86.01 <br />Phase II Released <br />825.14 <br />0 <br />0 <br />= 82.14 <br />Phase III Released <br />0 <br />0 <br />0 <br />= 0 <br />'Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />2Surface Mine Acres Disturbed = B&G + Long -Tenn Facilities + Active Mining Areas; Underground Mine Acres Disturbed = B&G + Long - <br />Tenn Facilities; Separately -permitted Loadouts = B&G + Long -Term Facilities <br />'Includes haul, access and light -use roads, temporary dams and impoundments; permanent dams and impoundments; diversion and collector ditches, <br />water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; office area, repair shops, and <br />parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; refuse piles and coal mine waste impoundments; head -of -hollow <br />fills; valley fills; ventilation shafts and entryways; and non -coal waste disposal area (garbage dumps and coal combustion by-products disposal <br />areas). <br />February 8, 2019 <br />