Laserfiche WebLink
B. The Operator shall, within two hundred ten (210) days of the effective <br /> date of this Order: <br /> 1. remove all imported materials from the Bucklen Pit and notify <br /> the Division that all imported material has been removed from <br /> the site, or <br /> 2. submit to the Division an application for a technical revision to <br /> permit number M-1982-131 describing how the Operator plans <br /> to remove the putrescible material and leave only inert material, <br /> and requesting the ability to use imported material that meets <br /> the standards of the Act and the Rules. All materials submitted <br /> to the Division must be in an approvable form. <br /> The Board imposes a CIVIL PENALTY for 65 days of violation pursuant to <br /> section 34-32.5-124(7), C.R.S. at $100 per day for a civil penalty of$6,500. All but <br /> $500 of the civil penalty is suspended if the Operator complies with the corrective <br /> action in the time specified. The portion of the civil penalty not suspended, $500, <br /> shall be due and payable within 30 days of the effective date of this Order. <br /> DONE AND ORDERED this /7 day of 4i% i5f' 2012. <br /> FOR THE COLORADO MINED LAND <br /> RECLAMATION BOARD <br /> Ron Peterson, Chair <br /> NOTICE OF APPEAL RIGHTS <br /> This order becomes effective and final upon mailing. Any party adversely affected or <br /> aggrieved by agency action may commence an action for judicial review by filing a <br /> notice of appeal with the district court,within thirty (30) days after the effective date <br /> of this order, pursuant to section 24-4-106, C.R.S. (2011). In the event that an appeal <br /> is filed, designations of record made in accordance with section 24-4-106(6), C.R.S. <br /> should be served on the Board at: 1313 Sherman Street, Room 215, Denver, CO <br /> 30203, Attention: Sitira Pope. <br /> Bucklen Equipment Company, Inc. <br /> Bucklen Pit, M-1982-131 <br /> M\'-2012-025 4 <br />