Laserfiche WebLink
For any non -criteria reportable pollutant: <br />If the emissions increase by 50% or five (5) tons per year, whichever is less, above the <br />level reported on the last APEN submitted to the Division. <br />Whenever there is a change in the owner or operator of any facility, process, or <br />activity; or <br />C. Whenever new control equipment is installed, or whenever a different type of control <br />equipment replaces an existing type of control equipment; or <br />d. Whenever a permit limitation must be modified; or <br />No later than 30 days before the existing APEN expires. <br />14. The requirements of Colorado Regulation Number 3, Part D apply at such time that any <br />stationary source or modification becomes a major stationary source or major modification <br />solely by virtue of a relaxation in any enforceable limitation that was established after August <br />7, 1980, on the capacity of the source or modification to otherwise emit a pollutant such as a <br />restriction on hours of operation (Colorado Regulation Number 3, Part D, VI.B.4/V.A.7.B). <br />With respect to this Condition, Part D requirements may apply to future modifications if <br />emission limits are modified to equal or exceed the following threshold levels: <br />GENERAL TERMS AND CONDITIONS: <br />15. This permit and any attachments must be retained and made available for inspection upon <br />request. The permit may be reissued to a new owner by the Division as provided in Regulation <br />Number 3, Part B, 11.13 upon a request for transfer of ownership and the submittal of a revised <br />APEN and the required fee. <br />16. If this permit specifically states that final approval has been granted, then the remainder of <br />this condition is not applicable. Otherwise, the issuance of this construction permit is <br />considered initial approval and does not provide "final" approval for this activity or operation of <br />this source. Final approval of the permit must be secured from the APCD in writing in <br />accordance with the provisions of 25-7-114.5(12)(a) C.R.S. and AQCC Regulation Number 3, <br />Part B, III.G. Final approval cannot be granted until the operation or activity commences and <br />has been verified by the APCD as conforming in all respects with the conditions of the permit. <br />Once self -certification of all points has been reviewed and approved by the Division, it will <br />provide written documentation of such final approval. Details for obtaining final approval to <br />operate are located in the Requirements to Self -Certify for Final Approval section of this <br />permit. The operator must retain the permit final approval letter issued by the Division after <br />completion of self -certification with the most current construction permit. <br />��ICOLORADO <br />Air Pollution Control Di�rie6on <br />OePuvrmt ct %bbc Yican 6 El OrvneM <br />Page 7 of 26 <br />Emissions - tons per <br />year <br />Facility <br />Equipment ID <br />AIRS Point <br />Equipment <br />Description <br />Pollutant <br />current <br />Threshold <br />permit <br />limit <br />Sum of all point <br />Sum of all <br />Coal processing <br />PMio <br />100 <br />41.2 <br />source <br />point source <br />(Point emissions <br />emissions <br />emissions <br />only) <br />PM2.5 <br />100 <br />32.9 <br />GENERAL TERMS AND CONDITIONS: <br />15. This permit and any attachments must be retained and made available for inspection upon <br />request. The permit may be reissued to a new owner by the Division as provided in Regulation <br />Number 3, Part B, 11.13 upon a request for transfer of ownership and the submittal of a revised <br />APEN and the required fee. <br />16. If this permit specifically states that final approval has been granted, then the remainder of <br />this condition is not applicable. Otherwise, the issuance of this construction permit is <br />considered initial approval and does not provide "final" approval for this activity or operation of <br />this source. Final approval of the permit must be secured from the APCD in writing in <br />accordance with the provisions of 25-7-114.5(12)(a) C.R.S. and AQCC Regulation Number 3, <br />Part B, III.G. Final approval cannot be granted until the operation or activity commences and <br />has been verified by the APCD as conforming in all respects with the conditions of the permit. <br />Once self -certification of all points has been reviewed and approved by the Division, it will <br />provide written documentation of such final approval. Details for obtaining final approval to <br />operate are located in the Requirements to Self -Certify for Final Approval section of this <br />permit. The operator must retain the permit final approval letter issued by the Division after <br />completion of self -certification with the most current construction permit. <br />��ICOLORADO <br />Air Pollution Control Di�rie6on <br />OePuvrmt ct %bbc Yican 6 El OrvneM <br />Page 7 of 26 <br />