Laserfiche WebLink
COLORADO <br />Division of Reclamation, <br />Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />February 26, 2019 <br />Barb Fielder <br />Colorado State Land Board <br />1127 Sherman Street <br />Denver, Colorado 80203 <br />RE: Williams Fork Mine, Permit No. C1981044 <br />Bond Release Application No. 4 (SL -4) <br />Dear Ms. Fielder, <br />In accordance with Rule 3.03.2(2) of the Rules and Regulations of the Colorado Mined <br />Land Reclamation Board for CoalMining, the Division is required to conduct a bond <br />release inspection within 30 days (7 March2019) of finding the SL4 bond release <br />application complete or as soon after, as the Division determines that weather conditions <br />allow. <br />Based on the current ground conditions of the bond release areas and mine site access, the <br />Division will schedule the bond release inspection in the late spring or early Summer of <br />2019. <br />Specific scheduling of the SL4 bond release inspection date will be determined based on <br />weather and ground conditions of the site. The current date is anticipated to be near the <br />middle of June 2019. <br />If you have any questions or comments please contact me at, (303) 8663567 ext 8105. <br />Kind Regards <br />Environmental Protection Specialist <br />Robin.reilleyLiTstate.co.us <br />Certified Mail No: 7014 0150 0000 9138 6119 <br />Return Receipt Requested <br />—0 <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br />Jared S. Polis, Governor I Dan Gibbs, Executive Director I Virginia Brannon, Director <br />