My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-02-22_PERMIT FILE - M2019010
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019010
>
2019-02-22_PERMIT FILE - M2019010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2025 3:56:35 AM
Creation date
2/22/2019 2:17:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019010
IBM Index Class Name
PERMIT FILE
Doc Date
2/22/2019
Doc Name
Application
From
John Kuijvenhoven
To
DRMS
Email Name
THM
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Portable crushing plant <br /> • Water Truck for dust suppression <br /> • Wheel Loader Cat 988, Cat 980 <br /> • Cat D-9 size dozer or equivalent <br /> • Caterpillar Excavator with Thumb <br /> Support equipment will to come to the site on an as-needed basis. <br /> It is anticipated that blasting will not be required. If the shelf rock is deemed too hard to rip out <br /> with an excavator, owner will notify the division of such activities. <br /> No refuse, acid or toxic producing materials are expected to be encountered in this operation. If <br /> these materials are encountered,topsoil will be placed over the area and mining will move to a <br /> different area. <br /> The stormwater containment berms are intended to hold the stormwater for less than 24 hours. <br /> This will be done by storing the water on the pit floor. The stormwater will infiltrate to the <br /> groundwater as it did prior to mining. <br /> All existing fencing will stay in place. Any new fencing will be installed according to the <br /> Division of Parks and Wildlife's specifications. <br /> The operator commits to clearly marking the permit boundary with stakes surveyed on site. It is <br /> planned that the material may be used to provide base material for construction projects in the <br /> area. <br /> One main road will be present in the mining area and will change locations in the pit as mining <br /> progresses. This road will access Mining Area 1, which also is accessed by the new access road. <br /> In pit roads are not delineated as they will move throughout mining. <br /> 4. Topsoil, Overburden Handling <br /> Topsoil will be salvaged from all Mining Areas as well as the reclaimed slope that needs to be <br /> re-disturbed. Topsoil from Mining Area 1 will be stockpiled in Topsoil Stockpile 1 located in the <br />
The URL can be used to link to this page
Your browser does not support the video tag.