Laserfiche WebLink
Colowyo Coal Company <br />2018 Annual Reclamation and Hydrology Report <br />Figure 5-2 — Topsoil Movements During Report Period <br />Topsoil Stripping <br />Topsoil Replacement <br />Task <br />Activity <br />Topsoil <br />Task <br />Activity <br />Placement <br />1 <br />Removed Topsoil from Collom Facilties Area <br />Pile 25A <br />Removed Topsoil from Collom Pit, Temporary <br />2 <br />Replaced Topsoil on East Pit Reclaim area <br />Piles 26A and <br />2 <br />Spoil Pile, and Collom Sediment Control <br />26B <br />Structures <br />Piles 15I, 27A, <br />3 <br />Removed Topsoil for Haul Road A Widening <br />and 17A <br />Topsoil Replacement <br />Task <br />Activity <br />Topsoil Pile <br />M ined <br />Replaced Topsoil on West Pit reclmation area <br />1 <br />Pile 16A and 15B <br />(WP026 - WP029) <br />2 <br />Replaced Topsoil on East Pit Reclaim area <br />Pile 16A and 15B <br />(EP060) <br />Areas Exempt from Topsoil Stripping Due to Conditions <br />Task Activity Acres Exempt <br />Page 30 <br />