My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-02-21_REVISION - C1996083 (10)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2019-02-21_REVISION - C1996083 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2019 8:28:46 AM
Creation date
2/22/2019 9:08:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
2/21/2019
Doc Name
Adequacy Review
From
Janet Binns
To
Zach Trujillo
Type & Sequence
TR118
Email Name
JHB
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Colorado Division of Reclamation, Mining and Safety <br />To: Zack Trujillo <br />From: Janet Binns <br />CC: Jason Musick <br />Date: February 21, 2019 <br />Re: Bowie No. 2, TR118 <br /> <br />The Division has received a technical revision (TR118) for Bowie No. 2 Mine. The mine <br />is and underground mine in temporary cessation and no mining or mining activity is <br />occurring on the ground. Activities occurring on the site are limited to maintenance, <br />weed management and monitoring activities. <br />Coal effuse pile, Gob Pile 33, had previously been approved to accept considerably more <br />refuse material, TR-105, of 1,135,000.cubic yards. The mine has ceased coal extraction, <br />and has no immediate plans to resume mining or washing coal. Therefore, the operator <br />does not anticipate adding additional coal refuse material to Gob #3 coal refuse pile. The <br />operator is currently re-compacting portions of the pile, and does not anticipate more than <br />750,000 cubic yards of refuse material on this pile. This will also reduce the overall <br />height of Gob pile #3. The operator notes that Gob Pile #3 will be constructed as <br />previously approved with TR-84 (AC 7/31/2014). <br />Please review the application for compliance with Rules 4.10 and 4.11. I will place a <br />PDF file of the application in V:Coal/JHB/Bowie #2/TR118A, and V:Coal/JHB/Bowie <br />#2/TR118B. If you prefer to review hard copies, I have one copy in my office. <br />The revision was deemed complete on February 21, 2018. A preliminary adequacy letter <br />will be sent to the operator by March 23, 2019. Please let me know of any concerns or <br />questions you have for the operator prior to that date. Thank you for your assistance.
The URL can be used to link to this page
Your browser does not support the video tag.