My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-02-21_INSPECTION - M1987113
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1987113
>
2019-02-21_INSPECTION - M1987113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 4:36:01 AM
Creation date
2/21/2019 2:15:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987113
IBM Index Class Name
INSPECTION
Doc Date
2/21/2019
Doc Name
Inspection Report
From
DRMS
To
Bestway Concrete
Inspection Date
2/14/2019
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERMIT#: M-1987-113 <br /> INSPECTOR'S INITIALS: ECS <br /> INSPECTION DATE: February 14,2019 <br /> OBSERVATIONS <br /> The Rocky Flats Pit was inspected by Eric Scott with the Division of Reclamation Mining and Safety (DRMS) as <br /> part of the routine monitoring inspection program. The site was last inspected in January of 2014. Mr. Mark <br /> Johnson with Bestway Concrete was also present for the inspection. <br /> The site is currently permitted for 95.07 acres, although it should be noted that the easternmost portion of the <br /> site cannot be mined at this time due to sand and gravel rights ownership issues. The site identification sign <br /> and boundary markers were present as required by Rule 3.1.12, but the sign should be replaced as it is in very <br /> poor condition (Photo 1). <br /> The Rocky Flats Pit is mined for sand, gravel and is located immediately east and adjacent to the Lakewood <br /> Brick and Tile Company Church Pit (M1979-045). An agreement between Bestway Concrete and Lakewood <br /> Brick exists to allow the joint operations currently taking place at the site. <br /> Mining is currently taking place in the large cell that makes up the southeast portion of the site, with material <br /> being processed and stockpiled near the center and south center of the site. A concrete plant is also located <br /> in the center of the site along the common permit boundary. <br /> No compliance issues were observed during this inspection. <br /> Inspection Contact Address <br /> Mark Johnson <br /> Bestway Concrete Company <br /> 301 Centennial Drive <br /> Milliken, CO 80543 <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.