PERMIT#: M-2003-001 <br /> INSPECTOR'S INITIALS: ECS <br /> INSPECTION DATE: February 19,2019 <br /> OBSERVATIONS <br /> This was a routine monitoring inspection conducted by DRMS at the Bestway Concrete Nissan Farm Resource <br /> site. There are 134.21 acres currently permitted at this 112c site. The inspection was conducted by Eric Scott <br /> of DRMS. The DRMS representative met with permittee representative Mark Johnson of Bestway Concrete at <br /> the site at approximately 0930. <br /> The site is currently being used by the Central Conservancy District as "in-ground water storage". The <br /> adjacent ditch is used to supply several shallow infiltration areas. The stripped topsoil and overburden from <br /> the construction of the infiltration ponds has been stockpiled near these areas on the site. The SEC) has <br /> previously approved the slurry wall that has been installed at the site. Although mining activity was not taking <br /> place during the inspection, material was being utilized from the existing stockpiles located on site. All site <br /> activity was noted to be taking place within the approved slurry wall which was marked with bright red <br /> fiberglass slats. <br /> It may also be noted that the recent road realignment and expansion that took place near the site entrance <br /> encroached into the originally approved permit boundary. <br /> The only compliance issue noted during this inspection was that the site identification sign was incorrect and <br /> should be modified or replaced to comply with Rule 3.1.12(1) as noted on the first page of this report by the <br /> corrective action date given (3/29/19). <br /> Inspection Contact Address <br /> Mark Johnson <br /> Bestway Concrete Company <br /> 301 Centennial Dr. <br /> Milliken, CO 80543 <br /> Enclosure <br /> CC: <br /> Page 2 of 4 <br />