<br /> Operator Name: MacFarland Enterprises, Inc. EXIBIT C Site Name: Hobo Mine 2
<br /> Permit Boundary & Mine Plan Map
<br /> Located in the NE1/4 and the NW1/4 of Section 17, in suspended T. 42 N., R. 6 W.,
<br /> New Mexico Principal Meridian, San Juan County, Colorado
<br /> Contird
<br /> D �" Comer 2�MS 1-60M97 Hobo D
<br /> $ I
<br /> I � 2
<br /> a
<br /> Corner 7,MS
<br /> $�. 14918 Queen
<br /> LEGEND
<br /> C • 2V?aluminum cap on a#6 rebar-IS 26597 / C
<br /> P.O.B Point of beginning 8
<br /> �^- - Permit Boundary �
<br /> m
<br /> o
<br /> rcm
<br /> \ 240-W
<br /> \ $ / P.0.9
<br /> \ s /
<br /> V/ Concurs shown are one(1)foot Interpolation.
<br /> Legal Description Permit area Hobo 2 mine
<br /> B Basis of Bearing B
<br /> The bearing between comer 2,MS 16097 Hobo monumented with a 212"aluminum cap on a#6 rebar,by LS 26597 and comer 7,MS 14916 Queen monumented
<br /> 2%"aluminum cap on a#6 rebar,by LS 26597 was found to bear S.13°24'42"W.
<br /> Beginning at a point whence corner 7,MS 14916 Queen bears N.19*03'17"E.,269.67 ft.dist.;thence N.20°16'31"W.,121.66 ft.,dist.;thence N.20"45'58"E.,12.97
<br /> ft.,dist.;thence N.22°36'49"E.,25.22 ft.,dist;thence N.18"40'57"E.,32.35 ft.,dist;thence N.24°31'38"E.,33.65 ft.,dist.;thence N.27°36'05"E.,29.69 ft.,dist;
<br /> thence N.29°23'14"E.,28.08 ft.,dist.;thence N.33057'29"E.,25.88 ft.,dist.;thence N.33°33'59"E.,29.73 ft.,dist.;thence N.13°32'02"E.,63.24 ft.,dist.;thence N.
<br /> 29°59'50"E.,41.75 ft.,dist.;thence N.43°48'55"E.,22.92 ft.,dist;thence N.32"51'29"E.,12.89 ft.,dist;thence N.27'05'54"E.,13.92 ft.,dist.;thence N.37"24'13"
<br /> E.,9.72 ft.,dist.;thence N.48'06'30"E.,12.71 ft.,dist.;thence N.62°27'39"E.,7.36 k.,dist.;thence N.65010'55"E.,8.56 ft.,dist.;thence N.85°50'46"E.,5.92 ft.,
<br /> disc.;thence S.72002'52"E.,7.68 ft.,dist.;thence S.52°22'14"E.,15,07 ft.,dist.;thence S.65°04'10"E.,17.07 ft.,dist.;thence S.59°00'21"E.,6.29 ft.,dist.;thence
<br /> S.08°38'25"E.,5.35 ft.,dist.;thence S.13°37'32"W.,19.38 ft.,dist.;thence S.05°49'26"W.,17.74 ft.,dist.;thence S.04°23'24"E.,14.11 ft.,dist;thence S.
<br /> 36°03'43"E.,13.01 ft.,dist;thence N.53°56'17"E.,1&00 ft.,dist.;thence N.36003'43"W.,7.90 ft.,dist;thence N.04°23'24"W.,T39 ft.,dist.;thence N.05°4926"
<br /> E.,14.90 ft.,dist;thence N.13°37'32"E.,21.70 ft.,dist.;thence N.08°38'25"W.,17.36 ft.,dist.;thence N.59°00'21"W.,15.71 ft.,dist.;thence N.65°04'10"W,
<br /> 16.02 ft.,dist.;thence N.52°22'14"W.,16.19 ft.,dist.;thence N.72°02'52"W.,14.32 ft.,dist.;thence S.85°50'46"W.,12.72 ft.,dist.;thence S.63*5723"W.,22.32
<br /> ft.,dist.;thence S.48°06'30"W.,16.66 ft.,dist.;thence S.37"24'13"W.,13.03 ft.,dist.;thence S.27°05'54"W.,14.63 ft.,dist.;thence S.32°51'29"W.,10.26 ft.,dist.;
<br /> thence S.43°48'55"W.,23.38 ft.,dist.;thence S.29°59'50"W.,46.53 ft.,dist.;thence S.13°32'02"W.,62.66 ft.,dist.;thence S.33°33'59"W.,26.49 ft.,dist.;thence
<br /> S.33°57'29"W.,26.54 ft.,dist.;thence S.29°23'14"W.,29.08 ft.,dist.;thence S.27°36'05"W.,30.45 ft.,dist.;thence S.24°31'38"W.,35.05 ft.,dist.;thence S.
<br /> 18°40'57"W.,32.66 ft.,dist.;thence S.22"36'49"W.,17.74 ft.,dist.;thence N.20°16'31"W.,6.37 ft.,dist.;thence S.55°00'00"W.,161.86 ft.,dist.;thence S.
<br /> 35°00'00"E.150.00 ft.,dist.;thence N.55°00'00"E.,122.44 ft.,dist.;to the point of beginning.Containing 0,713 acres
<br /> 1.Proposed start date for mining activates August 30,2018.
<br /> 2.Proposed ending date September 30,2028
<br /> 3.An eighteen(18)inch safety berm will be constructed around the existing pad area.
<br /> 5.Storm water control devises such as water bars or drainage ditches will be installed and maintained on the existing road.
<br /> 4.Production will be seasonal and minimal.Removal of less than 5oo lbs.of target material each season.Season will depend on
<br /> access due to snow and conditions.Generally sometime between June and August.Removal of the stone will be done with the use of
<br /> a jack-leg and the use of a non-Explosive Demolition Agent. IE:Expanding Grout. Holes will be drilled at a depth to provide the most O RTH
<br /> efficient use of this product.Holes will be approximately 1 5/8 inch diameter.The material will be hand sorted.Material will be hauled
<br /> on an existing road with an OHV.Material will not be stored on site.Material will be cut and processed off site.
<br /> Equipment:
<br /> Toyo 65#Jackleg.
<br /> Rented compressor.
<br /> Polaris ranger(Surface use only). of 80r 760r
<br /> A Note: SCALE.' 1 e=80' A
<br /> 1.Mining operation will not directly affect surface or ground water systems.
<br /> (9f0/38>-0600
<br /> ITC Resources LLC 19�o/a�4-2eao
<br /> 1205 H Lane,D,Itq C 81416
<br /> Smle: Revisoris:
<br /> 1�McFarland Enterprises, 2/11r19 Ina Do1e
<br /> 1081 Mineral St WW18
<br /> Sllvelton Colorado Drone.
<br /> 81433 KES
<br /> Signature Date Job x..b