Laserfiche WebLink
2 1 1 <br /> Operator Name: MacFarland Enterprises, Inc. EXIBIT C Site Name: Hobo Mine 2 <br /> Permit Boundary & Mine Plan Map <br /> Located in the NE1/4 and the NW1/4 of Section 17, in suspended T. 42 N., R. 6 W., <br /> New Mexico Principal Meridian, San Juan County, Colorado <br /> Contird <br /> D �" Comer 2�MS 1-60M97 Hobo D <br /> $ I <br /> I � 2 <br /> a <br /> Corner 7,MS <br /> $�. 14918 Queen <br /> LEGEND <br /> C • 2V?aluminum cap on a#6 rebar-IS 26597 / C <br /> P.O.B Point of beginning 8 <br /> �^- - Permit Boundary � <br /> m <br /> o <br /> rcm <br /> \ 240-W <br /> \ $ / P.0.9 <br /> \ s / <br /> V/ Concurs shown are one(1)foot Interpolation. <br /> Legal Description Permit area Hobo 2 mine <br /> B Basis of Bearing B <br /> The bearing between comer 2,MS 16097 Hobo monumented with a 212"aluminum cap on a#6 rebar,by LS 26597 and comer 7,MS 14916 Queen monumented <br /> 2%"aluminum cap on a#6 rebar,by LS 26597 was found to bear S.13°24'42"W. <br /> Beginning at a point whence corner 7,MS 14916 Queen bears N.19*03'17"E.,269.67 ft.dist.;thence N.20°16'31"W.,121.66 ft.,dist.;thence N.20"45'58"E.,12.97 <br /> ft.,dist.;thence N.22°36'49"E.,25.22 ft.,dist;thence N.18"40'57"E.,32.35 ft.,dist;thence N.24°31'38"E.,33.65 ft.,dist.;thence N.27°36'05"E.,29.69 ft.,dist; <br /> thence N.29°23'14"E.,28.08 ft.,dist.;thence N.33057'29"E.,25.88 ft.,dist.;thence N.33°33'59"E.,29.73 ft.,dist.;thence N.13°32'02"E.,63.24 ft.,dist.;thence N. <br /> 29°59'50"E.,41.75 ft.,dist.;thence N.43°48'55"E.,22.92 ft.,dist;thence N.32"51'29"E.,12.89 ft.,dist;thence N.27'05'54"E.,13.92 ft.,dist.;thence N.37"24'13" <br /> E.,9.72 ft.,dist.;thence N.48'06'30"E.,12.71 ft.,dist.;thence N.62°27'39"E.,7.36 k.,dist.;thence N.65010'55"E.,8.56 ft.,dist.;thence N.85°50'46"E.,5.92 ft., <br /> disc.;thence S.72002'52"E.,7.68 ft.,dist.;thence S.52°22'14"E.,15,07 ft.,dist.;thence S.65°04'10"E.,17.07 ft.,dist.;thence S.59°00'21"E.,6.29 ft.,dist.;thence <br /> S.08°38'25"E.,5.35 ft.,dist.;thence S.13°37'32"W.,19.38 ft.,dist.;thence S.05°49'26"W.,17.74 ft.,dist.;thence S.04°23'24"E.,14.11 ft.,dist;thence S. <br /> 36°03'43"E.,13.01 ft.,dist;thence N.53°56'17"E.,1&00 ft.,dist.;thence N.36003'43"W.,7.90 ft.,dist;thence N.04°23'24"W.,T39 ft.,dist.;thence N.05°4926" <br /> E.,14.90 ft.,dist;thence N.13°37'32"E.,21.70 ft.,dist.;thence N.08°38'25"W.,17.36 ft.,dist.;thence N.59°00'21"W.,15.71 ft.,dist.;thence N.65°04'10"W, <br /> 16.02 ft.,dist.;thence N.52°22'14"W.,16.19 ft.,dist.;thence N.72°02'52"W.,14.32 ft.,dist.;thence S.85°50'46"W.,12.72 ft.,dist.;thence S.63*5723"W.,22.32 <br /> ft.,dist.;thence S.48°06'30"W.,16.66 ft.,dist.;thence S.37"24'13"W.,13.03 ft.,dist.;thence S.27°05'54"W.,14.63 ft.,dist.;thence S.32°51'29"W.,10.26 ft.,dist.; <br /> thence S.43°48'55"W.,23.38 ft.,dist.;thence S.29°59'50"W.,46.53 ft.,dist.;thence S.13°32'02"W.,62.66 ft.,dist.;thence S.33°33'59"W.,26.49 ft.,dist.;thence <br /> S.33°57'29"W.,26.54 ft.,dist.;thence S.29°23'14"W.,29.08 ft.,dist.;thence S.27°36'05"W.,30.45 ft.,dist.;thence S.24°31'38"W.,35.05 ft.,dist.;thence S. <br /> 18°40'57"W.,32.66 ft.,dist.;thence S.22"36'49"W.,17.74 ft.,dist.;thence N.20°16'31"W.,6.37 ft.,dist.;thence S.55°00'00"W.,161.86 ft.,dist.;thence S. <br /> 35°00'00"E.150.00 ft.,dist.;thence N.55°00'00"E.,122.44 ft.,dist.;to the point of beginning.Containing 0,713 acres <br /> 1.Proposed start date for mining activates August 30,2018. <br /> 2.Proposed ending date September 30,2028 <br /> 3.An eighteen(18)inch safety berm will be constructed around the existing pad area. <br /> 5.Storm water control devises such as water bars or drainage ditches will be installed and maintained on the existing road. <br /> 4.Production will be seasonal and minimal.Removal of less than 5oo lbs.of target material each season.Season will depend on <br /> access due to snow and conditions.Generally sometime between June and August.Removal of the stone will be done with the use of <br /> a jack-leg and the use of a non-Explosive Demolition Agent. IE:Expanding Grout. Holes will be drilled at a depth to provide the most O RTH <br /> efficient use of this product.Holes will be approximately 1 5/8 inch diameter.The material will be hand sorted.Material will be hauled <br /> on an existing road with an OHV.Material will not be stored on site.Material will be cut and processed off site. <br /> Equipment: <br /> Toyo 65#Jackleg. <br /> Rented compressor. <br /> Polaris ranger(Surface use only). of 80r 760r <br /> A Note: SCALE.' 1 e=80' A <br /> 1.Mining operation will not directly affect surface or ground water systems. <br /> (9f0/38>-0600 <br /> ITC Resources LLC 19�o/a�4-2eao <br /> 1205 H Lane,D,Itq C 81416 <br /> Smle: Revisoris: <br /> 1�McFarland Enterprises, 2/11r19 Ina Do1e <br /> 1081 Mineral St WW18 <br /> Sllvelton Colorado Drone. <br /> 81433 KES <br /> Signature Date Job x..b <br /> 09-10 <br /> sheet 1 af 1 <br /> 2 1 <br />