Laserfiche WebLink
11)(Optional) Please provide additional information about the Reclamation Plan: <br /> disposedPo,tal sl ed will be dis,, antled app,OXillidtely thee (3) cubic yaidsof mate,W will be removed and <br /> a the SlIverton transfer station. <br /> Mine portal will be collapsed y method ot drilland blasting through a contract blasting company. <br /> Approximately 74 cubic yard of material will be needed to reclaim portal, pad and road to private <br /> property. Scree rock and waste rock from previous mining operation located on the dump slopes will <br /> be used for grading purposes, if any additional material is required it will be purchased and delivered <br /> through Maisel Excavation <br />