My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-02-15_PERMIT FILE - M2017044
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017044
>
2019-02-15_PERMIT FILE - M2017044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2025 3:40:54 AM
Creation date
2/15/2019 2:45:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017044
IBM Index Class Name
Permit File
Doc Date
2/15/2019
Doc Name
Adequacy Review Response
From
ITC Resources
To
DRMS
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D -Reclamation Plan <br /> Rule 6.3.4 (Starts on Page 139 of the Rules) <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will be <br /> used to reclaim the affected land to the proposed post-mining land use. Reclamation is required for all affected <br /> lands. This plan must be correlated to Exhibit E-Map. <br /> 1) Primary future(Post-mining) land use(check one): <br /> F Cropland(CR) = Pastureland(PL) General Agriculture (GA) <br /> Rangeland (RL) F-1 Forestry (FR) Wildlife Habitat(WL) <br /> Residential (RS) F-1 Recreation (RC) Industrial/Commercial (IC) <br /> 2) Please provide a general description of how the mined area will be Reclaimed: <br /> Mine Portal will be collapsed, approximately 74 cubic yard of material will be needed to reclaim <br /> portal, pad and road to private property. Back slope will be re-graded to work with existing contours <br /> or ata 'AH-1V_ Availahla tnp coil will di-,trihutPrl arrncc distijrhPd area and rP-sPeded_ (SaP ItPm 11) <br /> 3) What will the final grade of the reclaimed slopes (Horizontal:Vertical): 3 H: 1 V <br /> (Note: If the Applicant proposes slopes steeper than 3H: IV (example 1H:1 V, 2H: IV, etc.),please <br /> include a justification: <br /> a. Please provide a general description of the backfilling and grading: <br /> Approximately 74 cubic yard of material will be needed to reclaim portal, pad and road to private <br /> prnpprty Matarial will hp calvagPd frnm dump clnnPc and graded to 3H- 1 V (SPP ItPm 11) <br /> 4) Depth of topsoil to be salvaged (only for surface disturbances) (check one): <br /> F 4-6 inches F-1 6-8 inches <br /> 8-10 inches F-1 10-12 inches <br /> F-1_ Other: <br /> F__J_ N/A, explain: Tepseil that is available will be distributed aeress diStWbed <br />
The URL can be used to link to this page
Your browser does not support the video tag.