Laserfiche WebLink
RECLAMATION COST <br />FRANCISCOTTI PIT #2 <br />PLACE TOPSOIL OVER AREA <br />SCARIFY THE HARD PAN <br />SEED BED PREPARATION <br />FERTILIZER APPLICATION <br />SEEDING DRILLING METHOD SEED INCLUDED <br />MULCHING W/ HAY OR STRAW <br />WEED CONTROL ALLOWANCE <br />MOBILIZATION & DEMOBILIZATION <br />EXHIBIT "L" <br />........................... <br />RULE 6.4.11 EXHIBIT'all." <br />QTY. <br />UNIT <br />UNIT COST EXTENDED COST <br />230000 LCY <br />$1.25 <br />$287,500 <br />5 <br />ACRE <br />$130.00 <br />$650 <br />95.6 <br />ACRE <br />$200.00 <br />1 <br />$19,120 <br />95.6 <br />ACRE <br />$150.00 <br />$14,340 <br />95, 6 <br />ACRE <br />$250.00 <br />$23, 900 <br />95.6 <br />ACRE <br />$165.00 <br />$15,774 <br />e95.6 <br />ACRE <br />$25.00, <br />$2,390 <br />1 <br />EA. <br />$10,000.00 <br />$10,000 <br />