Laserfiche WebLink
C <br /> RECLAMATION COSTS BY OPERATION <br /> Topsoil reve etation cost/ac project total <br /> Equipment and operations 620.00 <br /> (regrading, fertilizing, seeding <br /> discing, mulching) <br /> Materials' 150.00 <br /> 770.00 770 x 1 ac 3=770.00 <br /> Reclamation slopes <br /> Equipment and operations 620.00 <br /> Materials2 440.00 <br /> 1067.00 1067 x 31 ac3 3307.00 a <br /> Tree transplanting cost per tree <br /> Equipments and operations: 127.00 <br /> MateriaW, 23.00 - <br /> 150.00 150 x 755= 11,250.00 <br /> Cost per acre $1,430.70 i <br /> �J <br /> adubitl 0 <br /> a <br /> c� <br /> ' Seed and fertilizer without organics <br /> 3 Estimated acreage (� <br /> 2 Seed, fertilizer with organics, mulch <br /> ( l <br /> Fertilizer with root stimulant <br /> f, <br /> 'Estimated tree number <br /> ri <br />