Laserfiche WebLink
3� <br /> L <br /> c) There will be no dredge and fill operations. <br /> d) Any temporary ditches constructed across drain ways will be removed after the O <br /> disturbed areas have been re-vegetated and stabilized. <br /> 2. Earthen dams may need to be constructed to control drainage as mining proceeds. O <br /> 3. All surface areas will be stabilized, including spoil piles, so as to effectively control a <br /> erosion. <br /> WILDLIFE: <br /> L_1 <br /> 1. Operations and conditions in the gravel pit area will have minimal impact on the wildlife of <br /> this area. This area is not known to be used exclusively for activities critical to the life <br /> cycles of wildlife that require special consideration. <br /> rjj <br /> 2. Upon vegetation establishment and maturation, the habitat will be managed as it was <br /> before gravel mining. Vegetation will be established to provide suitable cover and feeding (� <br /> material for wildlife (both game and non-game species). ) <br /> TOP SOILING: Lj <br /> 1. Where present topsoil will be removed prior to gravel mining and stock piled in a section a <br /> of the phase area designated for stock pile storage. If stockpiled for more than one year, <br /> the topsoil (interim) seed mixture will be applied during the growing season that follows <br /> stockpiling. <br /> 2. After existing trees for the first phase are harvested for firewood, the remaining shrubs, <br /> forbs and tree limbs along with grasses will be chipped and incorporated into the topsoil ,' <br /> stockpile. <br /> 3. The stockpile(s)will be located in area(s) of minimal runoff and disturbance from the L <br /> gravel mining operations. <br /> 4. The topsoil stockpile will be handled as little as possible. If relocation of a stockpile is <br /> required, the Board or Division will be contacted for approval by way of a technical <br /> revision. <br /> 5. Stability of replaced topsoil will be assured by scarification and roughening of the final <br /> grade, (before topsoil placement), to minimize slippage. <br /> 2 <br />