My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-02-13_REVISION - M2001038 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001038
>
2019-02-13_REVISION - M2001038 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2025 3:20:35 AM
Creation date
2/14/2019 9:46:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001038
IBM Index Class Name
Revision
Doc Date
2/13/2019
Doc Name
Request For Amendment To Permit
From
Albert Frei & Sons
To
DRMS
Type & Sequence
AM1
Email Name
JLE
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L <br /> RECLAMATION COSTS <br /> The following information is presented based on the Bond evalua- <br /> tions preformed by the Division of Reclamation Mining and Safety <br /> on September 14, 2018 Circes Reclamation Cost estimate . The <br /> current bond amount is $110, 860 . 00 which is current enough that <br /> wit should be used to set the bond for the amendment since only <br /> the permit area is being increased. <br /> The bond is based on having no more then 30 acres needing <br /> resoiling and seeding and 3300 feet of cut/fill bank sloping, <br /> based on 3h to lv. This flatter slope rate requires more mate- <br /> rial then the 2h to lv proposed but provides a cushion as bond <br /> unit costs rise . <br /> The following information based on the layout of the CIRCES COST <br /> SUMMARY FORM the Division provided in September 2018 . The <br /> numbers and sequencing were left in the order presented for ease <br /> of following this estimate . At this mine it is not necessary to <br /> import fill material to complete reclamation on the site . The <br /> methodology for the reclamation did not change from the 2001 <br /> amendment . <br /> Task Description Direct Cost <br /> 001 - Grade all slopes (1300 on South & East and <br /> 1800 ' on West and North) 7896yds x 1.124= 8, 872 $2, 109. 00 <br /> cyds @ 23 . 84,/yd <br /> 002 - Spread Topsoil - (30 . 0 ac - 12" deep ) $46, 583 . 00 <br /> 48,400 cyds @ 96 .2�/yd <br /> 003 - Revegetation work - (30. 0 acres seeding, <br /> includes dicing seed bed, mulch and secondary $32, 336. 00 <br /> seeding) 30 . 0 ac @ $1, 011.95/ac +30x2O%x$329.66/ac <br /> 004 - Mob/demob $6,462 . 00 <br /> Total Direct costs $87,490 . 00 <br /> INDIRECT COSTS <br /> Liability insurance @ 2 . 020 $1, 767.30 <br /> Performance bond @ 1 . 05% $918.65 <br /> Job Superintendent 152 00 hrs o $41 25/hr $2, 091. 06 <br /> Profit @ 10% 1 $8, 749.00 <br /> TOTAL INDIRECT COSTS $13, 526. 01 <br /> Financial warranty processing $500.00 <br /> Engineering work/bid preparation @ 4 .25% $4,293 .18 <br /> Reclamation Management @ 5% $5, 050 . 80 <br /> Total bond $110,859.99 <br /> RECOMMEND BOND REMAIN AT$110,860.00 <br /> 53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.