Laserfiche WebLink
MINING PLAN EXHIBIT D (cont) <br /> MINING TIMETABLE <br /> The continuing uncertainty of economic conditions in the con- <br /> struction materials industry precludes an accurate forecast of <br /> demand during the life of the mine . This estimated mining <br /> timetable is based on an average year and it is expected that a <br /> specific year will vary widely from the average . <br /> MINING TIMETABLE <br /> ACRES + AVERAGE ANNUAL <br /> MINING AREA YEARS PRODUCTION <br /> TOTAL MINED TONS/YEAR <br /> AREA AREA <br /> Mine 7-10 107 . 88 83 . 07 500, 000 <br /> 7 <br />