Laserfiche WebLink
#20 - CBA No.2 <br />(ae Aar PhIII Bad REQ <br />/--•• (,AAor P0MWW1t.III8ad RoQ <br />, <br />0 <br />#11 -CF <br />/ <br />iI P2Aa <br />/ <br />I <br />Phlll Bad RIO <br />(14AAar PMII11ad RY) <br />CRDA #1 ROAD <br />"2�111BpidFi9 #34-CRDA 1 & 2 <br />>� PONDS (6 & 10) <br />A� BYpo-IAiw aA. Aar Pnlll Bad Rq <br />QxsAarft m PhlllBadRt9 <br />#19-CRDA-2 <br />W 2Aar PAIII Bad 1" <br />Bad REQ <br />�J <br />#22 -ROADSIDE NORTH PORTAL MINE <br />FACILITIES AND STOCKPILE AREA <br />PUA�Phllllilw1.7 Aar Pwnwwd Pnlll Bond ftQ <br />- URI 1 1 RMN LV/ <br />#W7 Aa PMll ftW ft!) <br />(GBAa Pwnrn A Phlll Ba <br />I <br />I <br />I <br />I <br />I <br />/ <br />DATE <br />9 2011 Reclamation Update 77<H <br />#35 - Haul Roads to <br />Reclaimed <br />Areas through 2018 <br />CRDA 1, 2, & 3 <br />#1 - <br />(8A Aar Prrnwd Ph I II Bad R+Q <br />Blue Flame Mine; Fall 1985 - Area not available on maps (Work performed voluntarily <br />12 2014 Reclamation Update TKH <br />and therefore not required for this report). <br />#2 - <br />Permanent Flood Control Dike; Fall 1985 - Ph III Bond Release on 2.8 acres in April 2011 <br />#3 & <br />#4 - South Lease Exploration; Fall 1985 and Spring 1986 -See Exhibit SL -07-021 - Ph III Bond Release on <br />1512017 Reclamation Update 17KH 1 <br />7.0 acres in November 2015 <br />#5 & <br />#6 - North Decline; Fall 1992, Spring 1993, November 2000, April 2002, October 2011; (Cheatgrass treatment - November 2005 & <br />KEY <br />September 2006) (Tamarisk treatment/removalin ND Channel - October 2014) - Ph III Bond Release on 12.7 acres and <br />Represents areas reclaimed, backfilled, graded <br />0.5 permanent disturbance acres in November 2015; Ph III Bond Release on 0.5 acres in January 2017 <br />#7 - <br />NW Intake Portal; Spring 1993 - Ph III Bond Release on 0.1 acres in November 2015 <br />#8 - <br />Cameo Refuse Disposal Area No. 1; July 1994 - Ph III Bond Release on 10.3 acres in November 2015 <br />#9 - <br />Cameo Refuse Disposal Area No. 2; July and December 1994 and November 2001 - Ph III Bond Release on 7.5 acres in November 2015 <br />#10- <br />Cameo Borrow Area No. 1; July and December 1994, April 2002 and October 2012 - Ph III Bond Release on 2.5 acres in November 2015; <br />release during report year <br />Ph III Bond Release on 0.3 acres in January 2017 <br />#11- <br />Cameo Refuse Disposal Area No. 1 (Misc); July 1994 - Ph III Bond Release on 2.2 acres in November 2015 <br />#12- <br />South Fan; October 2000 - See Exhibit SL -16-009 - Ph III Bond Release on 0.9 acres in November 2015 <br />#13- <br />2 West Portals; October 2000 and October 2005 - See Exhibit 58 - Ph III Bond Release on 0.3 acres in November 2015 <br />#14- <br />North Decline Mine Dewatering System; April 2002 - Ph III Bond Release on 0.5 acres in November 2015 <br />#15- <br />Roadside Refuse Borrow Area; November 2002 - Ph III Bond Release on 3.4 acres in November 2015 <br />#16- <br />Roadside Refuse Disposal Area; November 2002 - Ph III Bond Release on 1.3 acres in December 2010 and 7.1 acres in November 2015 <br />#17- <br />Roadside South Portal Old Upper Diversion Ditch; November 2002 - Ph III Bond Release on 1.1 acres in November 2015 <br />#18- <br />Cameo Refuse Disposal Area No. 1; April 2002; Redisturb approximately one (1) acre on top of CRDA #1; December 2009 <br />Re -seed redisturbed one (1) acre on top of CRDA #1; September 2010 - Ph III Bond Release on 13.8 acres in November 2015 <br />Phase III Bond Release on 1.0 acres in August 2017 <br />#19- <br />Cameo Refuse Disposal Area No. 2; April and November 2002 - Ph III Bond Release on 20.2 acres in November 2015 <br />#20- <br />Cameo Borrow Area No. 2, Pond 11 and Coal Gulch Realignment; April 2002 and October 2012; Pond 11 area reseeded October 2105 - <br />Ph III Bond Release on 2.1 acres and 1.4 permanent disturbance acres in November 2015; Ph III Bond Release on 0.6 acres in January 2017; <br />Ph III Bond Release on 1.2 acres (Pond 11) in August 2017 <br />#21- <br />Access Road and Powerlines to No. 2 West Portals; No seeding required - Ph III Bond Release on 3.8 permanent disturbance acres <br />in November 2015 (Not shown on map) <br />#22- <br />Roadside North Portal Facilities, Stockpile Areas, G Substation, Pond 13 & Upper Diversion Ditch; November 2002, August 2003, December <br />2005, September 2008 & October 2012 - Ph III Bond Release on 21.1 acres & 1.7 permanent disturbance acres in November 2015; <br />Phase III Bond Release on 4.9 acres January 2017; Ph III Bond Release on 0.6 acres (G Sub) in August 2017 <br />#23- <br />Substation B; November 2002 <br />#24- <br />2 West Portals (Exhibit 58); December 2001 - Ph III Bond Release on 0.7 acres in November 2015 <br />#25- <br />Cameo Refuse Disposal Area Topsoil Piles; April 2002 - Ph III Bond Release on 2.9 acres in November 2015 <br />#26- <br />Conveyor Corridor; July 2003 - Ph III Bond Release on 0.5 acres in November 2009 and 2.2 acres in April 2011 <br />#27- <br />Conveyor Corridor; March 2004; (Tamarisk removal of apprx. 1.3 acres in January 2006) - Ph III Bond Release <br />on 1.3 acres in November 2009 <br />#28- <br />Substation A; August 2007 <br />#29- <br />Roadside South Portal Mine Facilites and Stockpile/Prep Plant Area and Conveyo Tunnel Under 1-70; Backfilled and Regrading completed <br />December 2007; Seeding completed February & March 2008; Ph III Bond Release on 13.5 acres in December 2010; Pond 8 backfilled and <br />seeded in Oct 2011; Pond 9 backfilled and seeded in April 2013; Pond 8 re -seeded in Oct 2014; Ph III Bond Release on 0.9 acres <br />(Ponds 8 & 9) in January 2017 <br />#30- <br />Roadside South Portal Road to Old Upper Diversion Ditch and Water Tank (Light Use Road #1); September 2007 <br />#31- <br />Railroad Loop Track (south of 1 9/0 Road); January 2009 - Ph III Bond Release on 0.3 acres in November 2009 <br />#32- <br />CRDA #1 Road; Placed, compacted, covered and seeded 1.2 acres September 2010 - Ph III Bond Release on 1.2 acres in August 2017 <br />#33- <br />UTL, Rail Spur, Overland Conveyor & Haul Road; Backfill and regrading was completed on apprx. 38.1 acres at this area <br />by October 2010. 0.9 acres was seeded - Ph III Bond Release on 66.7 acres and 0.9 permanent disturbance acres in April 2011 <br />#34- <br />Cameo Refuse Disposal Area No. 1 & 2 Sediment Ponds (Ponds 6 & 10) & Coal Creek Realignment; October 2012 - Ph III Bond Release <br />on 0.8 permanent disturbance acres in November 2015; Ph III Bond Release on 2.4 acres in January 2017 <br />#35- <br />Haul Roads to CRDA 1, 2 & 3 remain as permanent features - Ph III Bond Release on 3.4 permanent disturbance acres in November 2015 <br />C:�D a1v18�OW-D- <br />RarlmlI-RdR. 09018ARR <br />�J <br />#22 -ROADSIDE NORTH PORTAL MINE <br />FACILITIES AND STOCKPILE AREA <br />PUA�Phllllilw1.7 Aar Pwnwwd Pnlll Bond ftQ <br />- URI 1 1 RMN LV/ <br />#W7 Aa PMll ftW ft!) <br />(GBAa Pwnrn A Phlll Ba <br />I <br />I <br />I <br />I <br />I <br />/ <br />a <br />#16 - ROADSIDE REFUSE <br />DISPOSAL AREA <br />01A Aar Phil Bad liQ <br />4 ^s <br />/ I V Z - _/` <br />#30 - ROADSIDE SOUTH PORTAL ROAD TO OLD UPPER <br />DIVERSION DITCH AND WATER TANK (LT USE RD #1) <br />JhA�it +4 <br />10 - r%WP%UQIL/G n <br />BORROW AREA <br />M A=@ 8.4 PhIII Bad Rtp <br />i <br />\ o <br />#14 - NORTH DECLINE <br />MINE DEWATERING SYSTE <br />"Aar PMII Bond Roo 4 <br />#5 & #6- NORTH DECLINE <br />(18AAar Riad (182 PAIII Bond Rap <br />(1.7 Aar Pwnwad AA Phlll Bad lip <br />)ERMIT <br />a <br />DD <br />oo <br />#23 - SUBSTATION B <br />>REPARED BY: J. E. STOVER & ASSOCIATES, INC. <br />2352 N 7th St, Unit B <br />y- - Grand Jct., CO 81501 <br />REFERENCES <br />REVISIONS <br />No. I DESCRlPT70N: BY I <br />DATE <br />9 2011 Reclamation Update 77<H <br />02 12 <br />11 2013 Reclamation Update 77<H <br />4,1 <br />IIIfI�'11�1�11,1,1 <br />12 2014 Reclamation Update TKH <br />r I�111111IIII'1/1 <br />13 2015 Reclamation Update <br />01116 <br />14 12016 Reclamation Update 7KH <br />01117 <br />1512017 Reclamation Update 17KH 1 <br />01 18 <br />1612018 Reclamation Update TKH 1 <br />B • B <br />KEY <br />Represents areas reclaimed, backfilled, graded <br />a <br />#16 - ROADSIDE REFUSE <br />DISPOSAL AREA <br />01A Aar Phil Bad liQ <br />4 ^s <br />/ I V Z - _/` <br />#30 - ROADSIDE SOUTH PORTAL ROAD TO OLD UPPER <br />DIVERSION DITCH AND WATER TANK (LT USE RD #1) <br />JhA�it +4 <br />10 - r%WP%UQIL/G n <br />BORROW AREA <br />M A=@ 8.4 PhIII Bad Rtp <br />i <br />\ o <br />#14 - NORTH DECLINE <br />MINE DEWATERING SYSTE <br />"Aar PMII Bond Roo 4 <br />#5 & #6- NORTH DECLINE <br />(18AAar Riad (182 PAIII Bond Rap <br />(1.7 Aar Pwnwad AA Phlll Bad lip <br />)ERMIT <br />a <br />DD <br />oo <br />#23 - SUBSTATION B <br />>REPARED BY: J. E. STOVER & ASSOCIATES, INC. <br />2352 N 7th St, Unit B <br />y- - Grand Jct., CO 81501 <br />REFERENCES <br />REVISIONS <br />No. I DESCRlPT70N: BY I <br />DATE <br />9 2011 Reclamation Update 77<H <br />02 12 <br />11 2013 Reclamation Update 77<H <br />02 14 <br />12 2014 Reclamation Update TKH <br />01115 <br />13 2015 Reclamation Update <br />01116 <br />14 12016 Reclamation Update 7KH <br />01117 <br />1512017 Reclamation Update 17KH 1 <br />01 18 <br />1612018 Reclamation Update TKH 1 <br />01 19 <br />KEY <br />Represents areas reclaimed, backfilled, graded <br />and seeded during report year <br />Represents areas pemonently seeded <br />prior to report year <br />Represents areas that achieved final Phase <br />111 <br />release during report year <br />Represents areas that achieved final Phase 111 <br />release prior to report year <br />N <br />W E <br />ONE INCH <br />DESIGNED: <br />DRAWN: D.A.J. 10/08/02 <br />CHECKED: <br />PREPARED FOR: <br />SNOWCAP COAL COMPANY <br />P.O. Balt 1480, Pt16Bds, CO •1838 <br />PROJECT: SNOWCAP COAL COMPANY <br />TITLE: <br />ANNUAL RECLAMATION <br />2018 <br />DRMS I.D. No. C-1981-041 DWG. NAME: <br />SCALE: 1" 2 <br />= 400' n 018Afpp <br />R <br />W <br />