My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-02-13_REPORT - C1981041
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981041
>
2019-02-13_REPORT - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 7:45:38 AM
Creation date
2/14/2019 7:39:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Report
Doc Date
2/13/2019
Doc Name
Annual Reclamation Report
From
J. E. Stover & Associates, Inc
To
DRNS
Annual Report Year
2018
Permit Index Doc Type
Annual Reclamation Report
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snowcap Coal Company, Inc. -11- 2018 Annual Reclamation Report <br /> <br />Phase III Bond Release – 0.6 acres <br /> <br />North Portal Sedimentation Control Features - Pond 13, portion of the old <br />upper diversion ditch and the flume area at the end of the upper diversion <br />ditch were filled, regraded and seeded. Phase I Bond Release was <br />approved on 2.0 acres with SL-8 on November 14, 2015. Phase II & III <br />Bond Release was approved on 2.0 acres with SL-9 on January 3, 2017. <br />Area – 2.0 acres <br />Date – October 2012 <br />Seed Mix – “Seed Mix, Table 14-8”, Upland Components <br />Phase III Bond Release – 2.0 acres <br /> <br /> Permanent Disturbance – North Portal - Portions of the Upper Diversion <br /> Ditch, 1.4 acres, and the remnants of Top Soil Pile #2, 0.3 acres, were <br /> approved as permanent features on August 12, 2012 with PR-5. Phase I, <br /> II & III Bond Release was approved on 1.7 acres with SL-8 on November <br /> 14, 2015. <br /> Area – 1.7 Acres <br />Phase III Bond Release – 1.7 acres <br /> <br />23. Substation B - Superstructures, fences, slabs and components removed <br />during 2002. Graded to approximate original contours and seeded. <br />Phase I Bond Release was approved on 0.3 acres with SL-2 on October <br />27, 2003. Phase II Bond Release was approved on 0.3 acres with SL-8 <br />on November 14, 2015. Located in the SW¼ Section 35, T10S, R98W, <br />6th P.M. <br />Area - 0.3 acres <br />Date - November 2002 <br /> Seed Mix - “Seed Mix, Table 14-8”, Upland Components <br /> <br />24. 2 West Portals - Substation of portal area-Reference Exhibit 58. Phase I <br />Bond Release was approved on 0.7 acres with SL-2 on October 27, 2003. <br />Phase II & III Bond Release was approved on 0.7 acres with SL-8 on <br />November 14, 2015. Located in the NE¼, Section 11, T11S, R98W, 6th <br />P.M. <br />Area - 0.7 acres <br />Date - December 2001 <br /> Seed Mix - “Seed Mix, Table 14-6” <br /> Phase III Bond Release – 0.7 acres <br /> <br /> <br />25. Cameo Refuse Disposal Area Topsoil Piles - These piles were used for <br />top soiling the CRDA2 during final reclamation activities. Phase I Bond <br />Release was approved on 2.9 acres with SL-2 on October 27, 2003. <br />Phase II & III Bond Release was approved on 2.9 acres with SL-8 on <br />November 14, 2015. Located in the SE¼, Section 28, T10S, R98W, 6th <br />P.M. <br />Area - 2.9 acres <br />Date - April 2002
The URL can be used to link to this page
Your browser does not support the video tag.