Laserfiche WebLink
Snowcap Coal Company, Inc. -9- 2018 Annual Reclamation Report <br /> <br /> <br />20. Cameo Borrow Area No. 2 - Material was excavated from CBA2 for the <br />covering of the CRDA1. Approximately 5.1 acres were seeded in April <br />2002, however a further disturbance will be needed here with the removal <br />of Pond 11. Approximately 0.6 acres were re-disturbed and re-seeded <br />during the reclamation of Pond 11. Phase I Bond Release was approved <br />on 2.7 acres with SL-2 on October 27, 2003. Phase II & III Bond Release <br />was approved on 2.1 acres with SL-8 on November 14, 2015. Phase II & <br />III Bond Release was approved on 0.6 acres with SL-9 on January 3, <br />2017. Located in the SE¼, Section 28, T10S, R98W, 6th P.M. <br />Area - 2.7 acres <br /> 0.6 acres (re-disturbed) <br />Date - April 2002 <br /> Seed Mix - “Seed Mix, Table 14-13”, Upland Components <br /> Phase III Bond Release – 2.7 acres <br /> <br />Pond 11 – The pond was filled, regraded, top-soiled and seeded. Phase I <br />Bond Release was approved on 1.2 acres with SL-8 on November 14, <br />2015. This area was covered with mud during a flash flood in July 2015. <br />The area was re-tilled, re-seeded and mulched in November 2015. Phase <br />II Bond Release was approved on 1.2 acres with SL-9 on January 3, 2017. <br />Postmining Land Use was changed to Commercial with PR-6 on January <br />3, 2017. Phase III Bond Release was approved on 1.2 acres with SL-10 <br />on August 29, 2017. <br />Area – 1.2 acres <br />Date – October 2012, Reseed November 2015 <br />Seed Mix – “Seed Mix, Table 14-8”, Upland Components <br />Phase III Bond Release – 1.2 acres <br /> <br /> Permanent Disturbance - Coal Gulch Realignment - The acres <br /> associated with the realignment of Coal Gulch, 1.4 acres, were approved <br /> as permanent features on August 12, 2012 with PR-5. Phase I, II & III <br /> Bond Release was approved on 1.4 acres with SL-8 on November 14, <br /> 2015. Located in the N½NE¼, Section 34 and the NW¼NW¼, Section <br /> 35, T10S, R98W, 6th P.M. <br /> Area – 1.4 Acres <br /> Phase III Bond Release – 1.4 acres <br /> <br />21. Permanent Disturbance - Access Road and Power lines to No. 2 West <br />Portals - By agreement with the Bureau of Land Management, the access <br />road was left in place and is considered a permanent disturbance. The <br />power line reclamation was finished during 2002. Phase I, II & III Bond <br />Release was approved on 3.8 acres with SL-8 on November 14, 2015. <br />Area - 3.8 acres <br />Date - July 2002 <br /> Seed Mix - No backfilling or seeding required <br /> Phase III Bond Release – 3.8 acres <br /> <br />