Laserfiche WebLink
Page 1 of 1 <br /> TABLE 1 <br /> BOWIE NO.1 MINE <br /> SURFACE WATER MONITORING-STREAMS <br /> REQUIRED MONITORING FREQUENCY <br /> STATION PRESENTLY PERMIT FIELD WATER MONITORED DRAINAGE WATERSHED FLUME INSTALLATION NOTES <br /> NO. MONITORED? ACTION FLOW (cfs) PARAMETERS QUALITY BASIN AREA STREAM GAUGE TYPE SIZE DATE <br /> Data recorder activated is 09/27/82. <br /> SW-1 NO NONE -- -- -- WEST FORK TERROR CREEK 18.44 sq.ml. Stilling well and recorder -- Sep-82 Well and recorder attached to <br /> existing culvert. <br /> SW-2 NO NONE -- -- -- EAST FORK TERROR CREEK 5.94 sq.ml. Parshall flume and recorder 4'x 30" Sep-82 <br /> SW-4 NO NONE ._ -_ __ TRIBUTARY TO WEST FORK TERROR 1.0 sq.ml. Crest stage gauge -- Sep-82 <br /> CREEK <br /> SW-5 YES NONE Quarterly Quarterly Annualy STEVENS GULCH 4.01 sq.ml. Parshall flume and recorder Tx 30" Sep-82 <br /> SW-6 YES NONE Quarterly Quarterly Annualy EAST ROATCAP CREEK- 3.59 sq.ml. Parshall flume and recorder 3'x 30" Sep-82 <br /> DOWNSTREAM <br /> SW-7 NO NONE __ -- __ TRIBUTARY TO FIRE MOUNTAIN 0.72 sq.ml. Crest stage gauge -- Sep-82 <br /> CANAL <br /> SW-8 NO NONE -- -- -- COAL GULCH 0.80 sq.ml. Crest stage gauge -- Sep-82 <br /> SW-9 NO NONE -- -- -- WEST ROATCAP CREEK-UPSTREAM -- Parshall flume and recorder V x 30" Nov-88 Relocated to West Roatcap. Located <br /> in East Roatcap 07/83 trough 1986. <br /> SW-10 NO NONE Quarterly Quarterly Quarterly TERROR DITCH -- Parshall flume and recorder 2.5'x 30" Jul-83 <br /> SW-11 NO NONE -- -- -- MAIN ROATCAP CREEK ? Concrete weir and recorder -- Jun-83 Stilling well and recorder attached to <br /> weir <br /> SW-12 NO NONE -- -- -- ROBERTS/STUCKER DITCH -- Parshall flume and recorder 2'x 30" Jun-83 <br /> UERC NO NONE -- -- -- EAST ROATCAP-ABOVE WEST MINE ? Grab sample point -- Nov-86 Sampling initiated during West Mine <br /> construction for TSS,TDS. <br /> LERC NO NONE -- -- -- EAST ROATCAP-ABOVE WEST MINE ? Grab sample point -- Nov-86 Sampling initiated during West Mine <br /> construction for TSS,TDS. <br /> NOTES: 1) First quarter and monthly monitoring shall be initiated when sites are accessible. Second quarter and monthly monitoring shall be initiated by no later than May 15 of each year unless the Division is consulted <br /> 2) SW-1 Transferred to the Bowie No.2 Mine Permit <br /> Surface Water Tab <br /> TR-65 Volume 4 Revised 12/2018 <br />