EXHIBIT C <br /> Mining Plan <br /> (a.) Mining will commence April 2019 and continue till no more sand is needed 2045 possible. <br /> (b.)There is no salvageable material to remove or to stock pile.Sand source is on top in creek. <br /> (c.) No overburden <br /> (d.)The deposit thickness varies of thickness most does not exceed 6 ft. <br /> (e.)There is no major components of the mining operations such as office,shop,buildings. <br /> Haul road is an existing road the owner uses to check on his livestock. <br /> (f.)There should be no major disturbances to the land.We are removing the sand from the creek. <br /> (g.)The existing roads are 15 feet wide and they will be used for truck traffic. No improvements <br /> Are necessary.There will be runoff from area. <br /> (h.) No water is need for this operation. <br /> (i)No.ground water will be incurred.Surface water will flow through the pit area.This is expected. <br /> Mining operation will try to be conducted in off flood season. But if it conducted during the <br /> Summer months,the mining operation will leave the creek smooth at end of operations. So <br /> There is only clean deposit of sand left in areas mined. No sediment or chemical will be <br /> In countered. <br /> 0.)Will comply with state water laws and regulation governing existing water rights.We will <br /> Not be impending any water or damming and water. <br /> (k.) NO refuse or toxic producing materials will be exposed. <br /> (I.)There will be hardly any if it all any disturbance to the hydrologic balance, prevent off-site <br /> damage by not disturbing the natural water flow. By leaving a little sand on the bottom <br /> of the creek bed,this will keep the natural sand protecting the clay bottom creek. <br /> (m.)There will be no processing on site. <br />