My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-02-12_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2019-02-12_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2019 9:58:46 AM
Creation date
2/12/2019 9:49:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
2/12/2019
Doc Name Note
Emailed
Doc Name
Application
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
TR118
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$ COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />87 1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule 1.04(73), <br />technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule 1.04(90), All revisions <br />are to address the requirements of Rule 2.08.4. Three (3) copies of the revision, including maps, must be <br />submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, <br />tables and/or figures, with a revised table of contents, if necessary. The revision submittal date should be printed <br />in the lower right corner of each revision page. A cover letter to the revision should explain the nature of the <br />revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing list <br />(except OSM) at the same time the application is submitted to the Division, and proof of distribution must be <br />submitted to the Division along with the application. Copies of revision pages modified during the review process <br />must be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. <br />Permit No.: C - 1996 - 083 pate: 02 1 08 1 2019 <br />Permittee: Bowie Resources, LLC <br />Bowie No. 2 Mine <br />Street: P.O. Box 483 <br />City: Paonia <br />State: CO Zip Code: 81428 - <br />Brief Description of Revision: Reduce size of gob pile #3. <br />Public Notice Attached: Yes ✓ No_ (Required for PRs and TRs) <br />Bond Increase: Yes — No ✓ <br />Federal ✓ Non -Federal _ <br />Mine <br />Proposed Change in: <br />Permit Area - <br />Surface Ownership - <br />Disturbed (+1-} _ _ 0 . <br />0 Acres <br />Private Land (+1-) _ <br />0 .0 Acres <br />Permit (+I-) _ 0 . <br />0 Acres <br />Federal Land (+1-) _ <br />0 0 Acres <br />Affected (+1-) 0 . <br />0 Acres <br />State Land (+1-) <br />_ 0 0 Acres <br />Mineral Ownership - <br />Mineral Private (+I-) _ _ <br />0 0 Acres <br />Mineral State (+l-} <br />_ 0 0 Acres <br />Mineral Federal (+I-)_ ® <br />0 0 Acres <br />
The URL can be used to link to this page
Your browser does not support the video tag.