My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-02-07_PERMIT FILE - M2019007
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2019007
>
2019-02-07_PERMIT FILE - M2019007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 10:01:08 AM
Creation date
2/8/2019 8:58:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019007
IBM Index Class Name
Permit File
Doc Date
2/7/2019
Doc Name
Application
From
Asteroid Explorations LLC
To
DRMS
Email Name
DMC
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C-Mining Plan <br /> Rule 6.3.3 (Starts on Page 136 of the Rules) <br /> The purpose of the mining plan is to describe how mining will affect the permit area through duration of the <br /> operation. The plan must be correlated to Exhibit E-Map. <br /> 1) Estimated dates of commencement: III Fit R and completion: (0/15-12,0 <br /> 2) How many years is the mine anticipated to be operational: 2. years <br /> 3) Will mining activities occ r all-yearlong or just seasonally when weather permits(check one): <br /> (n)all-yearlong or( V�)seasonally,explain: W pA,-{i,pr pent y„,t -tit <br /> 4) How many aces of the mine site will be disturbed at any given time: acres <br /> 5) Det of topsoil to be salvaged(only for surface disturbances)(check one): <br /> 4-6 inches 6-8 inches <br /> 8-10 inches 10-12 inches <br /> Other: <br /> n N/A, explain: ,—,/ <br /> 6) Will you need to move any overburden(check one): ( n)Yes or(�r1 )No <br /> a. If yes,approximately how thick is the overburden? feet <br /> 7) How will the mine be accessed: (EJ )existing roads( n)new roads will be created <br /> Please describe the existing roads: C <br /> Prw k-L b fir+' rDa-A WW1( (Gtopt0When,- <br /> a. If there will be new roads or road improvements, please describe the new roads and road <br /> improvements: <br /> CiAloh,t r ool A f 2' wvim As +o re)u tce o144..5-4-A"18) Will Will water be needed during the mining operation(check one): (1 91Yes or( )No <br /> a. If yes, please describe the source of the water and how much water will be used during the <br /> operation: <br /> • <br /> LAAA-er (.)tlt Cc y S w41 "ass Tnrrt, .SK s4Gr). <br /> ptoproy tr►vtAe.ti ,6 gw,(LomS per d,,�,J' �,/ <br /> 9) Will any water diversionssJ)or impoundments be constructed(check one): ( l RIYes or( El )No <br /> a. If yes,please describe the water diversionsimpoundments:or . <br /> b 14 e. re c A A+1-CrI, Ip b bi,l 'fv GO)14-stuAn f'fS 141+1% el IDA ss 41vv-.c_, <br /> wa.. pL rawt,1 4e a11,1A.44, <br /> 10) <br /> LI4,.- <br /> 10)Will any chemicals be used during the mining process(check one): ( )Yes or(moo <br /> a. If yes,please describe the chemical types and quantities to be utilized,chemical storage and <br /> spill containment and emergency response plans for on-site spills. Plant operation details <br /> should include tank capacities and operating solution volumes: <br />
The URL can be used to link to this page
Your browser does not support the video tag.