16)Please provide an estimate of the actual costs to reclaim the site based on what it would <br /> cost the State of Colorado using an independent contractor to complete reclamation. The <br /> Office adds up to an additional maximum eighteen and one half(18.5%)percent of that <br /> total,which includes a private contract,typical overhead costs and profit. <br /> Direct Cost: <br /> i. Backfilling: .38' g 8 S (cubic yards)X$ . 2.4I (cost per yard)=Total$ 14.2 o <br /> ii. Grading: 3 S• ir88 (cubic yards)X$_ •2I (cost per yard)=Total$ 21) • <br /> iii. Topsoil: 321'0 (cubic yards)X$ , 2 'f' (cost per yard)=Total$ l3 Sb . <br /> iv. Seeding: Z (acres)X$ '1,. 30 (cost per acre)=Total$ 172. (.o . <br /> v. Mobilization: 2- (Pieces of equipment)X $ tot, (cost per equipment)= <br /> Total$ Go-3492.(00. <br /> Direct Cost Subtotal: $ (0 3lv 2. Cob <br /> Division's total overhead cost: X 18.5% <br /> Division's Total cost: $ 75 <br /> Note: Based on the Division's experience the required financial warranty is normally set at <br /> approximately$2,500 per acre. Therefore,a typical 5 acre permit will have a total required financial <br /> warranty in the amount of$12,500. <br />