Laserfiche WebLink
POND NHN-001 AS -BUILT <br />Pond Construction and Compliance Demonstration <br />The as -built drawing for Pond NHN-001 is provided on Map 2.05.3(4)-6 and includes a plan <br />view, cross-sections and stage -storage curve. The principal spillway consists of a riser at <br />elevation 5675.50 feet, with a 24 -inch diameter pipe, an 18 -inch diameter restrictor plate, and a <br />pair of valved 6 -inch diameter weepholes at elevation 5671.50 feet. The emergency spillway is a <br />combination rip -rapped trapezoidal channel at elevation 5676.50 feet (minimum 15 feet wide <br />with 2h:1 v or flatter side slopes) which flows into a 72" concrete drop inlet. The drop inlet feeds <br />a 24 -inch diameter CMP which then flows to outlet (see Map 2.05.3(4)-6). <br />SEDCAD was used to analyze hydrology and sedimentology and the demonstration indicates <br />Pond NHN-001 is adequate to store the 10 -YR, 24 -HR storm event and five (5) years of <br />accumulated sediment. With the weepholes open, the peak water level is 5674.35 feet, which is <br />1.15 feet below the principal spillway riser and 2.15 feet below the emergency spillway channel. <br />The SEDCAD demonstration for the 25 -YR, 24 -HR storm event indicates that with weepholes <br />closed, Pond NHN-001 will safely convey the peak discharge with 1.01 feet of freeboard from <br />the peak level (5676.99 feet) to the top of the structure (5678.00 feet). <br />Embankment <br />Foundation preparation for the embankment of Pond NHN-001 included removal of vegetative <br />and organic materials and scarification of the ground. The embankment fill material was <br />constructed free of sod, roots, vegetative matter and frozen soil. Lambert and Associates on-site <br />compaction testing services were utilized on an as -needed basis and their testing methods were in <br />accordance with ASTM Test Method, D2922 and D3017, for Nuclear Moisture Content and Dry <br />Density for accepted material testing practices in the area. All final field density tests indicated <br />90% or greater relative compaction. The faces and slopes of the embankment are being planted <br />during the first growing season to establish vegetation. <br />Additionally, Lambert and Associates performed a slope stability analysis of the embankment <br />using "Slope Stability Analysis" by Geosoft computer software. Their stability analysis <br />considered a crest width of 10 feet, embankment height of 9.5 feet and embankment inclination <br />of 3h:1 v (upstream and downstream). This configuration applies only to the theoretical stability <br />assessment, for actual side slopes measurements at specific locations, refer to Map 2.05.3(4)-6. <br />The analysis indicated a theoretical factor of safety of 1.53 for the pond embankment. <br />Appendix 2.05.3(4)-6 Page 1 December 2018 (TR -19) <br />