My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-01-17_PERMIT FILE - C1996083A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083
>
2019-01-17_PERMIT FILE - C1996083A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 8:38:36 AM
Creation date
2/8/2019 8:22:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
1/17/2019
Doc Name
pages 2.05-84 to 2.05-165
Section_Exhibit Name
Volume I 2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05.6(6) <br />The Operator performed on -the -ground visual monitoring for subsidence <br />damage (including fracturing) in Sheep Corral gulch in the area where <br />multiple seam mining will occur. This monitoring was initially performed <br />within 3 months after the gate road entries are developed, and on a quarterly <br />basis thereafter during mining of the respective panels, and for six months <br />post mining (monitoring to be done as weather permits). Mining occurred in <br />the B-8 and B-9 panels from July 2009 through March 2010. Fractures were <br />surveyed during November 2009 and the results sent to the Forest Service <br />and the DRMS in March 2010. Fractures in this area were surveyed again in <br />July 2010 and the results sent to the Forest Service and the DRMS in August <br />2010. <br />The Operator has installed 15 subsidence monuments along the Pitkin Mesa <br />Pipeline to monitor subsidence. Since mine activity is moving to the north an <br />additional 7 subsidence monuments will be installed. Because of the <br />monument's close proximity to Stevens Gulch Road, some of the same <br />monuments will serve to measure subsidence along the road if any. <br />Additional monuments will be installed along Stevens Gulch Road as shown <br />on Map 27. The monuments will be installed one year prior to mining under <br />the Road and the Pitkin Mesa Pipeline. <br />The Operator has installed subsidence monuments near its three cabins. <br />The Operator will conduct fish, sediment and macroinverteb rate sampling (as <br />performed by WWE and MEC in 2012) on a biennial schedule during mining <br />activities and twice following mining activities (at 5 and 10 year periods) <br />underneath West Fork Terror Creek prior to bond release. A report will be <br />distributed to the DRMS, BLM, USFS, and the USFWS documenting if <br />statistically significant declines are observed related to mining activities. <br />(BLM Decision Record (DOI-BLM-CO-S050-2013-0010 EA)) <br />TR -100 2.05-171 - 03/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.