Laserfiche WebLink
On VLFs, the ore will be dumped in a manner to adhere to approved practices <br /> and slope angles. Overburden material (waste rock) will be transported to <br /> previously approved OSAs. All mining designs will account for the material as <br /> fill (not in-situ rock) and therefore the designs will account for the proper, <br /> previously approved angles to adhere to geotechnical stability. <br /> Should you require further information please do not hesitate to contact Katie Blake at <br /> 719.689.4048 or Katie.BlakeitTTnewmont.com, or me at 719.689.4042 or <br /> Justin.Raglin@newmont.com. <br /> Sincerely, <br /> Justin Raglin <br /> Senior Environmental Manager <br /> Cripple Creek and Victor Gold Mine <br /> EC: Tim Cazier, DRMS <br /> Dan Williams, Teller County <br /> Figure (1) <br />