My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-01-31_REVISION - M1996052
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1996052
>
2019-01-31_REVISION - M1996052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:54:25 PM
Creation date
2/1/2019 2:21:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996052
IBM Index Class Name
Revision
Doc Date
1/31/2019
Doc Name
Application
From
L.G. Everist, Inc.
To
DRMS
Type & Sequence
TR1
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L.G. EVERIST, INC. FIRESTONE GRAVEL RESOURCE <br /> M-1996-052 Revised: January 25, 2019 <br /> RECLAMATION COST REVISION <br /> The following information is provided to reevaluate the <br /> current bond and is based on the layout of the 2010 CIRCES COST <br /> SUMMARY FORM the Division provided during the last amendment <br /> permitting process. The numbers and sequencing were left in the <br /> order presented in 2010 for ease of following this estimate. The <br /> numbers presented in each item are updated where needed. At this <br /> mine it is not necessary to import fill material to complete <br /> reclamation on the site. The methodology for the reclamation did <br /> not change only the areas of work were increased to reach a <br /> maximum disturbance that is the most expensive area to reclaim. <br /> Map Exhibit C-i Mining Plan Map(revised 1/2019) shows how the <br /> mine would look at the time presented in this estimate. The <br /> change made to the information previously provided includes, <br /> increasing the total disturbance area; the length of working <br /> face: and the amount of area needing reclamation. The QA/QC <br /> number directly reflects the costs L.G. Everist has paid on 3 <br /> recent slope construction projects done by an outside construc- <br /> tion company. The superintendent time is based on those projects <br /> also. Typically the superintendents we have worked with are at a <br /> site for 2 hours a day and their lead equipment operator then <br /> provides supervision the rest of the day. We used the same <br /> equipment chosen in the 2010 estimate. <br /> The equipment used in the estimate is. <br /> Scraper teams - 2-Cat 627G scraper, D9R Dozer, 104H grader & <br /> water truck - Resoiling <br /> Grader - Cat 140H - seedbed prep and ripping plant sites <br /> 2-Dozers - Cat D9R - liner construction <br /> Dewatering Pump data 1-600M (6000 gpm) , 15" , 12"suction & dis- <br /> charge hoses <br />
The URL can be used to link to this page
Your browser does not support the video tag.