My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-01-30_HYDROLOGY - M1989120
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1989120
>
2019-01-30_HYDROLOGY - M1989120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 1:55:00 PM
Creation date
2/1/2019 12:52:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989120
IBM Index Class Name
Hydrology
Doc Date
1/30/2019
Doc Name
Substitute Water Supply Plan
From
DWR
To
DRMS
Email Name
PSH
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lease of Excess Augmentation Credits <br />This water lease is by and between Aggregate Industries-WCR, Inc. ("Al") and Bucklen Equipment Co., Inc. <br />("Bucklen'), sometimes collectively referred to as "the Parties". <br />WHEREAS Bucklen operates a gravel pit Substitute Water Supply Plan (SWSP) for the Bucklen Pit approved <br />by the Division of Water Resources in accordance with C.R.S. §37-90-137(11); and <br />WHEREAS under conservative assumptions the 2019 SWSP approval for the Bucklen Pit SWSP projects <br />that the Bucklen Pit SWSP will have excess augmentation credit totaling 62.0 acre-feet during the 2019 plan <br />approval period; and <br />WHEREAS Al operates a combined substitute supply plan (CoSSP) for its various gravel pits approved by <br />the Division of Water Resources in accordance with C.R.S. §37-90-137(11); and <br />WHEREAS the Al CoSSP may require additional augmentation credit during the 2019 irrigation season; <br />NOW THEREFORE, in consideration of the foregoing, it is agreed as follows: <br />1. Bucklen will lease to Al as needed any excess augmentation credit it has available during the 2019 <br />irrigation season according to the Bucklen Pit SWSP monthly accounting submitted to the Division of <br />Water Resources. The amount of excess augmentation credit that will be available during the 2018 <br />irrigation season is currently estimated to equal the values below: <br />2. The water leased to Al is for the exclusive use by Aland shall not be leased or conveyed to others except <br />by written permission from Bucklen. <br />3. The cost of the lease water shall be $100 (ONE HUNDRED DOLLARS) per acre-foot. The volume of water <br />leased by Al each month will be reported to Bucklen within thirty days of the close of that month. <br />Payment will be made by AI within thirty days following the end of the 2019 irrigation season for all water <br />leased. This payment shall be nonrefundable and is not contingent upon AI's actual usage of the water. <br />DATED this 0. day of December, 2018. <br />Aggregate Industries-WCR, Inc. <br />Signature: JN aki" <br />Date: /� -�' '� <br />Bucklen Equipment Company, Inc. <br />// Ij'a1 <br />Date: I0-� I I "A- I /� <br />
The URL can be used to link to this page
Your browser does not support the video tag.