Laserfiche WebLink
ARCOSA <br /> rates shown in the table are rates that assume the use of a seed drill. In those areas where hydro <br /> seeding or broadcast seeding are required, the seeding rate will be increased by at least 50 percent <br /> for flat lying areas and 75 percent for slopes. Seeding in each case will occur between November 1 and <br /> April 30 when the ground is not frozen. The seeded areas will be irrigated if climate conditions warrant. <br /> A Noxious Weed Management Plan has been developed and incorporated at the site. The plan is <br /> included as Attachment 1. <br /> The land owner has requested that an access road to the quarry bottom be left in place for his future <br /> use. Consequently, our final reclamation map shown as Exhibit F, reflects access per his request. This <br /> road will also serve to facilitate access to the area for final reclamation maintenance and monitoring. <br />