Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task#01A Page 4 of 4 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 1600.00 0.00 3.00 3.00 2183 0.996 <br /> Haul Time: 0.996 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) M) (fpm) Time <br /> min <br /> 1 1600.00 0.00 3.00 3.00 2936 0.700 <br /> Return Time: 0.700 minutes <br /> Total Truck Cycle Time: 5.334 minutes <br /> Loading Tool unit <br /> Production 497.79 LCY/Hour Adjusted for job efficiency: 413.17 LCY/Hour <br /> Truck Unit Production <br /> 235.81 LCY/Hour Adjusted for job efficiency: 195.72 LCY/Hour <br /> Optimal No.of Trucks: 2 Truck(s) Selected Number of Trucks: 2 Truck(s) <br /> Adjusted hourly truck team production: 391.44 LCY/Hour <br /> Adjusted single truck/loader team production: 391.44 LCY/Hour <br /> Adjusted multiple truck/loader team production: 391.44 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 151.63 Hours <br /> Unit cost: $1.017 /LCY Total job cost: $60,389 <br /> CIRCES Cost Estimating Software <br />