Laserfiche WebLink
1 <br /> Mobilization Worksheet Cont'd Task#06A Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: LEADVILLE <br /> Total one-way travel distance: 13.00 miles <br /> Average Travel Speed: 40.00 mph <br /> Total Non-Roadable Mob/Demob Cost <br /> `*two round trips with haul rig: $6,591.83 <br /> Total Roadable Mob/Demob Cost** <br /> **one round trip,no haul rig: $7.95 <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.33 0.33 <br /> Return Time(Hours): 0.33 0.33 <br /> Loading Time(Hours): 0.50 NA <br /> Unloading Time(Hours): 0.50 NA <br /> Subtotals: 1.65 0.65 <br /> JOB TIME AND COST <br /> Total job time: 3.30 Hours <br /> Total job cost: $6,600 <br /> CIRCES Cost Estimating Software <br />