Laserfiche WebLink
INSPECTION PERIOD: bPr 4PIlt thru E/' 20 page 1/1 <br /> INSPECTOR: <br /> DAM:SAN LUIS PROJECT TAILING DAM CHECK ACTION <br /> NEEDED <br /> O <br /> INSEA z <br /> PECTED w CONDITION YES NO OBSERVATIONS o Q w <br /> C 2 zO <br /> 1 ANY SURFACE CRACKING? <br /> 2 JANY UNUSUAL LOW AREAS? <br /> CREST 3 ANY RUTS OR PUDDLES? <br /> 4 ANY HORIZONTAL OFFSET? <br /> 5 NEED VEGETATION CONTROL? LX <br /> 6 JANY SLIDES,SLOUGHS,SCARPS? v <br /> UPSTREAM 7 JANYSINKHOLES OR UNUSUAL DEPRESSIONS? <br /> SLOPE& 8 ANYEROSION? <br /> BEACH AREA 9 CHANGES AT ABUTMENT CONTACTS? ✓ <br /> 10 NEED VEGETATION CONTROL? <br /> 11 <br /> 12 ANY WET AREAS? <br /> 13 ANY SLIDES,SLOUGHS,SCARPS? ✓' <br /> DOWNSTREAM 14 CHANGES AT DA%ABUTMENT CONTACT? v <br /> SLOPE 15 ANY EROSION? oi. <br /> 16 ANY UNUSUAL BULGING OR SLOPE MOVEMENT? <br /> 17 NEED VEGETATION CONTROL? <br /> 18 <br /> SEEPAGE 19 IS DRAIN OUTLET CLOGGED OR OBSTRUCTED? ✓ <br /> COLLECTION 20 ARE DRAIN FLOWS MUDDY OR TURBID? I/ <br /> AND 21 IS EMBANKMENT WET AROUND DRAIN OUTLET? ✓ ntr ih Gt✓dcrv� <br /> PUMPBACK 22 ANY PROBLEMS WITH COLLECTION POND? <br /> SYSTEM 23 IS PUMPBACK SYSTEM WORKING PROPERLY? ✓ <br /> 24 <br /> 25 ANY EROSION? ✓ <br /> DIVERSION 26 NEED VEGETATION CONTROL? Vol' <br /> CHANNEL AND 27 ANY DEBRIS IN CHANNELS OR DROP STRUCTURE? ✓ <br /> DROP 28 ANY CRACKS OR DETERIORATION OF CONCRETE? ✓ <br /> STRUCTURE 29 ANY CORROSION OF PIPE? <br /> 30 <br /> ADDITIONAL COMMENTS(REFER TO ITEM NO.IF APPLICABLE): <br />