My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-01-24_REVISION - C1982056 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2019-01-24_REVISION - C1982056 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2019 12:41:43 PM
Creation date
1/24/2019 12:19:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
1/24/2019
Doc Name
Adequacy Review
From
DRMS
To
Twentymile Coal company
Type & Sequence
PR12
Email Name
TNL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />4. The Division understands that TC is pursuing leasing the Federal coal with a Lease By <br />Modification (LBM) for the inclusion of the Wolf Creek Seam in the Federal Coal Lease COC - <br />54608. Per Rule 2.03.6 Right of Entry, the Division cannot approve a mine plan that includes <br />mining in the Wolf Creek Seam within this area until the LBM has been approved. Should the <br />LBM not be approved by the time all other PR -12 adequacy issues have been resolved, TC will <br />have to request continued extension of the decision due date until the LBM is approved. <br />5. The proposed revised text (p.2.04.11) does not appear to line up with currently approved pages <br />and appears to be missing information necessary for the review of PR12. Please provide <br />updates to the section WOLF CREEK RESERVES including: <br />a. The updated status of the pooled water, <br />b. The updated plan to manage the pooled water, including any updates to relevant <br />exhibits. <br />c. Updated text relative to MSHA approval to undermine the PR12 proposed panels, <br />including if that approval is for development, long wall, and/or retreat mining, as well as <br />any exhibits that may need to be updated or submitted to provide this documentation. <br />6. The proposed revised text (p.2.05-181.11) includes a new exhibit, Exhibit 7K, addressing an <br />inventory of structures and renewable resource lands. This exhibit was not included with the <br />PR -12 application. Please provide the Division with Exhibit 7K for further evaluation of <br />adequacy. <br />7. The proposed revised text states that the worst possible impacts from subsidence in the PR -12 <br />area are evaluated and addressed in exhibit 7K. Please provide the Division with Exhibit 7K for <br />further evaluation of adequacy <br />8. The text on pages 2.05-181.11 through 2.05-181.14 references Map 23B. The text also <br />references Map 23WC and Map 23WCB. Are these the same map? Please update the text on <br />these pages to reflect a consistent naming of the map(s) and provide the division updates to <br />Maps 23WC and 23WCB to the division. <br />a. Please ensure panels are labelled in these maps <br />9. Currently approved Map 23 Wolf Creek Mine Plan Map was last updated with RN7, Please <br />update this map including the state of the underground mine pool, subsidence monitoring <br />areas, additional surface features, and affected area boundary. <br />10. Please Update Map 23c- Mine Plan Surface Disturbance and Monitoring (which does not appear <br />to depict all items which will be under mined). <br />
The URL can be used to link to this page
Your browser does not support the video tag.