Laserfiche WebLink
M20flz0a4 <br /> 4PGCC <br /> Rio Grande <br /> Pueblo Plant <br /> August 7, 2018 RECEIVED <br /> Mr. Elliott Russell <br /> Environmental Protection Specialist <br /> Division of Reclamation and Mining Safety <br /> 1313 Sherman St. Room 215 DIVISION OF RECL4WTION, <br /> Denver, CO 80203 MINING AND SAFETY <br /> Re: Pueblo Cement Plant and Limestone Quarry. DRMS Permit No. M-2002-004 <br /> Semi-Annual Groundwater Monitoring Report <br /> Dear Mr. Russell: <br /> Pursuant to TR-03 of the referenced permit, GCC conducted water sampling on its groundwater monitoring <br /> well MW-005 on 08/07/2018 at approximately 02:45 PM. <br /> Samples were not collected from MW-005 since the well was found to be ft at that time. <br /> Should you have any questions/comments about this submission, please contact me at(719)647-6861 or <br /> eolivares@gcc.com <br /> Sinc ely <br /> a , <br /> Edwin Olivares <br /> Environmental Engineer <br /> GCC Rio Grande,Inc.• Pueblo Plant <br /> 3372 Lime Road•Pueblo,CO 81004 <br />