Laserfiche WebLink
Table 2.05.3(3)-5 <br />Overhead Power and Buried Phone Relocations <br />Location <br />Distance(ft) <br />Where and When Replaced <br />Timing of Restoration <br />From BB/2700 Rd intersection, <br />Electric - overhead lines were <br />2700 Rd south <br />south along 2700 Rd, to mine <br />permanently installed in 2009 for this <br />of BB Rd <br />760 <br />permit boundary. Temporary <br />section. Phone line was permanently <br />Intersection <br />removed until mining and 2700 <br />rerouted and plowed in alongside BB <br />Rd are reconstructed. <br />Rd, east of 2700 Rd. <br />Electric — overhead lines were <br />2700 Rd north <br />Electric and Phone — <br />permanently installed in 2009 for this <br />of BB Road <br />2174 <br />Temporarily placed on BB <br />section. A new phone line was buried <br />Intersection <br />Detour Rd <br />alongside 2700 Rd his area as well. <br />San Miguel Power has no plans for re - <br />BB Rd east of <br />establishing the power lines. Once <br />2700 Rd <br />2285 <br />Temporarily placed on BB <br />overhead lines were installed along <br />Intersection <br />Detour Rd <br />2700 Rd in 2009, they no longer <br />needed the BB Detour Rd buried line <br />BB Rd west of <br />1 <br />2700 Rd <br />3400 <br />Temporarily placed on BB Rd <br />2014 when area is reclaimed <br />Intersection <br />Generally, these lines parallel the roads and are relocated and restored with them. All restored <br />phone and power lines will be buried. New Horizon has been working with San Miguel Power <br />Co. and Nucla Naturita Telephone Company regarding the relocations and replacements. The <br />plans for all relocations and restorations have been agreed and will be designed, contracted and <br />installed by both utility companies. New Horizon will reimburse the utilities for the cost of the <br />work. <br />Section 2.05.3(3) Page 46 April 2017 (MR -104) <br />