My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-12-11_PERMIT FILE - C1981008A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2018-12-11_PERMIT FILE - C1981008A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 10:33:40 AM
Creation date
1/24/2019 7:19:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/11/2018
Doc Name
Mine Facilities
Section_Exhibit Name
Section 2.05.3(3) Table of Contents & Mine Facilities
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
After mining continues west of 2700 Road and the area for the permanent line has been <br />backfilled and graded, the permanent line can be installed and should be ready for the 2005 <br />irrigation season. <br />T. Relocation of Utilities <br />1. Electric <br />When the mining operation crosses BB Road, the buried phone line and overhead power line <br />along it will be relocated to the BB Detour Road. The buried phone line and overhead power line <br />along 2700 Road will be temporarily located along the Morgan access road located south of the <br />property. Once 2700 Road is restored, the utilities will be restored in this permanent ROW as <br />well. The phone lines are under the control of Nucla - Naturita Telephone Company and the <br />power line is owned and operated by San Miguel Power Association. The locations of the <br />original utilities, as well as the relocated utilities, are shown on Map 2.05.3(3)-3. The following <br />table summarizes the distances of power and phone lines that were removed and relocated. <br />As of January 2010, the mining operations have advanced west of 2700 Road. New overhead <br />electric lines were installed and put into service in 2009, alongside the newly constructed 2700 <br />Road in the permit boundary and leading to Second Park homes. As well, the temporary buried <br />power lines paralleling BB Detour was abandon that formally serviced Second Park residence. <br />The buried power line that paralleled BB/2700 Road, from Patty Morgan's home to Frank <br />Morgan's house is still in use and San Miguel Powers plan is to leave it as the permanent <br />installation. As of now, the buried power line continues around the edge of BB/2700 Road to the <br />Enstrom families. When mining is finished on the WFC -Johnson property, a new overhead <br />electric line will be constructed along the newly constructed BB West Road, starting at BB/2700 <br />Road intersection and going west to service the Enstrom families. When this is complete, the <br />temporary buried power line from Frank Morgan's home to BB West Road will be abandon. The <br />old overhead line that was located west of 2700 and BB Road intersection to approximately the <br />start of the BB Detour Road will not be needed or constructed according to San Miguel power. <br />Section 2.05.3(3) Page 44 April 2017 (MR -104) <br />
The URL can be used to link to this page
Your browser does not support the video tag.