Laserfiche WebLink
2. Waste Water <br />Sewage from the existing buildings will be disposed of through an existing sanitary sewer lines <br />discharging into a sewer main on Lincoln Street which is owned by the Nucla Sanitary District. <br />Waste water from the equipment wash will be run through a sediment trap and an oil water <br />separator and discharged to Pond 018 via a natural drainage. <br />3. Domestic Water <br />Potable water will be provided through a water line tied into the Town of Nucla water system. <br />4. Solid Wastes <br />Solid waste will be picked up by the local waste disposal contractor for disposal in the Montrose <br />County Landfill. The land fill is privately owned and operates under the regulations mandated <br />by the State of Colorado and Montrose County. Solid wastes not suitable for disposal at the <br />landfill will be transported to and disposed of in suitable, licensed facilities under the applicable <br />Federal and State regulations. When practicable, solid wastes will be separated for recycling. <br />S. Explosive Stora <br />No explosive storage facilities are needed for the New Horizon Mine. Blasting will be carried <br />out by a licensed independent contractor who will own and maintain explosive storage facilities <br />off-site and transport explosives to the mine site as needed. The contractor may maintain small <br />field magazines on the mine site, but no explosives will be stored at the mine overnight. <br />6. Fuel Stora-ae <br />One above ground fuel tank will be utilized. One tank of approximately 1,000 gallons capacity <br />will be used for gasoline storage. The gasoline tank is located at the fuel and lubricant storage <br />and dispensing facility proximal to the truck shop. The tank is enclosed by berms and has spill <br />prevention and safety protection devices as mandated by the appropriate regulatory authorities. <br />Spill prevention and containment measures will be implemented under the New Horizon Mine <br />Spill Prevention Control and Counter-measure (SPCC) Plan. <br />7. Coal Handling Structures <br />Coal from the New Horizon mine is hauled in highway trucks to the power plant for use. New <br />Horizon has a coal storage area within the existing facilities area as shown on Map 2.05.3(3)-8. <br />Section 2.05.3(3) Page 37 September 2017 (TR -81) <br />