Laserfiche WebLink
Table 2.05.3(3)-3 <br />Timing of Road, Ditch, and Utility Detours and Restorations <br />Item <br />Description <br />Date <br />1 <br />Construct BB Road Detour <br />2000 <br />2 <br />Installed 26" and 12" pipeline to divert West Lateral Ditch around <br />2002 <br />the active mine area east of 2700 Road <br />Installed a portion of the 26" HDPE pipe into its permanent <br />3 <br />location in Section 1 (west of 2700 Road to end of pipeline - <br />2003 <br />Morgan field) <br />4 <br />Construct BB/2700 Detour Road to Morgan, Enstrom, Johnson, <br />2003 <br />Wilcox <br />5 <br />Extended the temporary 12" HDPE pipeline further into Section <br />2006 <br />36 to service James Johnson <br />6 <br />Abandon the temporary 12" HDPE pipeline to Johnson property. <br />2007 <br />No longer needed since WFC exercised its lease agreement. <br />Bury the 26 " and 12" HDPE pipeline into its permanent location <br />7 <br />in Section 31 and connect it to the already permeant 26" pipe in <br />2007 <br />Section 1 to completely finish the entire pipeline project. <br />Finish building 2700 and BB East Road to final graveled grade. <br />8 <br />The road was opened for Public use and BB Detour Road was <br />2008 <br />closed. Pavement still needs to be completed for project is <br />finalized. <br />9 <br />Pave 2700 Road and BB Road in original locations and restore <br />2010 <br />Sunshine Ranch Corner intersection. <br />10 <br />Remove BB Road detour and reclaim road area <br />2009 <br />1 I <br />Mine west to last cut at western permit boundary <br />2013 <br />12 <br />Backfill final cut with overburden stockpile <br />2015 <br />13 <br />Retopsoil and revegetate final cut area <br />2018 <br />14 <br />Replace BB Road from Sunshine Ranch Corner to western <br />2015 <br />boundary. <br />15 <br />Continue to irrigate and monitor reclaimed areas until final bond <br />2015 -Bond Release <br />release. <br />As of PR -08, the Sunshine ranch intersection has been restored and paved. The BB Road Detour <br />will be reclaimed by the end of 2009, except for the portion on the Benson east property, which <br />will remain at the request of the landowner. A letter from the landowner certifying his desire for <br />the road to remain can be found in Attachment 2.05.3(3)-8. A section of BB Road Detour road to <br />the CCC Ditch head gate will also be retained at the request of the landowner. Please see Section <br />Q Support Facilities, Item 10 Roads. All county road construction has been completed and <br />approved by Montrose County. <br />Section 2.05.3(3) Page 35 September 2017 (TR -81) <br />