Laserfiche WebLink
LIST OF ATTACHMENTS <br /> Attachment 2.05.3(3)-1 Collection/Diversion Ditches and Culverts Design Parameters <br /> Attachment 2.05.3(3)-2 As-Built Calculations of Pond 007 <br /> Attachment 2.05.3(3)-3 Typical Soil Grain Size Analysis <br /> Attachment 2.05.3(3)-4 Pond 008 As-Built <br /> Attachment 2.05.3(3)-5 Pond 009 As-Built <br /> Attachment 2.05.3(3)-6 Ponds 013 As-Designed Calculations <br /> Attachment 2.05.3(3)-7 Small Area Exemptions <br /> Attachment 2.05.3(3)-8 County Agreement and Montrose County Road Easement Agreement <br /> Attachment 2.05.3(3)-9 Rockfill Embankment Specifications 5th Street Road <br /> Attachment 2.05.3(3)-10 Exploration Drill Holes <br /> Attachment 2.05.3(3)-12 Sediment Pond 012 Engineering Design <br /> Attachment 2.05.3(3)-13 Pond 012 As-Built <br /> Attachment 2.05.3(3)-15 Pond Slope Stability Analyses <br /> Attachment 2.05.3(3)-16 Demonstration for Retention of Pond 007 <br /> Attachment 2.05.3(3)-17 Letters to Retain Buildings and Structures in Table 2.05.3(3)-4 and <br /> Road to CCC Ditch Headgate <br /> Attachment 2.05.3(3)-19 Demonstration of Retention for Pond 008 <br /> Attachment 2.05.3(3)-21 Pond 013 As-Built <br /> Attachment 2.05.3(3)-22 Pond 015 Design 100YR-24HR, Full Containment <br /> Attachment 2.05.3(3)-23 Seismic Survey <br /> Attachment 2.05.3(3)-24 Pond 015 As-Built <br /> Attachment 2.05.3(3)-25 Second Park Lateral Relocation Piping <br /> Attachment 2.05.3(3)-26 Trench Drain Design <br /> Attachment 2.05.3(3)-27 BB Road West of 2700 Road SEDCAD Calculations for Culverts <br /> Attachment 2.05.3(3)-28 Pond 018 Sediment Control System <br /> Attachment 2.05.3(3)-29 Pond 016 Postmining SEDCAD Modeling <br /> Attachment 2.05.3(3)-30 Pond 009 Postmining SEDCAD Modeling <br /> Attachment 2.05.3(3)-31 Pond 012 Postmining SEDCAD Modeling <br /> Attachment 2.05.3(3)-32 Pond 013 Postmining SEDCAD Modeling <br /> Attachment 2.05.3(3)-33 Pond 015 Postmining SEDCAD Modeling <br /> Attachment 2.05.3(3)-34 Engineering Office Alternate Sediment Control Effluent Demonstration <br /> Attachment 2.05.3(3)-35 Pond 018 As-Built <br /> Attachment 2.05.3(3)-36 Pond 016 As-Built <br /> Attachment 2.05.3(3)-37 Alternate Sediment Control Demonstration on GW46 Trust Property <br /> Attachment 2.05.3(3)-38 Goforth Stock Pond Design(SP1) <br /> Section 2.05.3(3) Page iii October 2018 (TR-86) <br />