Laserfiche WebLink
F. Sedimentation Ponds 008 through 018 Design Parameters <br />In accordance with Rule 4.05.2, Ponds 007 through 018 will be used to prevent, additional <br />contributions of sediment to stream flow or runoff outside the permit area due to mining <br />disturbance. Pond 011 has been fully reclaimed and some of the drainage area that was <br />previously to be handled by these ponds is now handled by Pond 013. The pond designs and or <br />run-off calculations for the sedimentation ponds are shown below: <br />Pond <br />Attachment <br />Maps <br />Pond 007 <br />Attachment 2.05.3(3)-2 <br />Map 2.05.3(3)-2-1 and Map 2.05.3(3)-2-2 <br />Pond 008 <br />Attachment 2.05.3(3)-4 <br />Map 2.05.3(3)-4-1 and Map 2.05.3(3)-4-2 <br />Pond 009 <br />Attachment 2.05.3(3)-5 <br />Map 2.05.3(3)-5-1 <br />Attachment 2.05.3(3)-30 <br />Attachment 2.05.3(3)-30, Map 1 <br />Pond 011 <br />Attachment 2.05.3(3)-20 <br />Map 2.05.3(3)-14 <br />Pond 012 <br />Attachment 2.05.3(3)-12 <br />Map 2.05.3(3)-12-1 <br />Attachment 2.05.3(3)-13 <br />Map 2.05.3(3)-12-2 <br />Attachment 2.05.3(3)-31 <br />Map 2.05.3(3)-12-3 <br />Map 2.05.3(3)-12-4 <br />Attachment 2.05.3(3)-31, Map 1 <br />Pond 013 <br />Attachment 2.05.3(3)-6 <br />Map 2.05.3(3)-6-1 <br />Attachment 2.05.3(3)-21 <br />Attachment 2.05.3(3)-32, Map 1 <br />Attachment 2.05.3(3)-32 <br />Pond 014 <br />Attachment 2.05.3(3)-11 <br />Map 2.05.3(3)-11 <br />Pond 015 <br />Attachment 2.05.3(3)-22 <br />Map 2.05.3(3)-15 <br />Attachment 2.05.3(3)-24 <br />Map 2.05.3(3)-19 <br />Attachment 2.05.3(3)-33 <br />Attachment 2.05.3(3)-33, Map 1 <br />Pond 016 <br />Attachment 2.05.3(3)-29 <br />Attachment 2.05.3(3)-29, Map 1 <br />Attachment 2.05.3(3)-29, Map 2 <br />Attachment 2.05.3(3)-36 <br />Map 2.05.3(3)-36 <br />Pond 018 <br />Attachment 2.05.3(3)-28 <br />Attachment 2.05.3(3)-28, Map 1 <br />Attachment 2.05.3(3)-28, Map 2 <br />Attachment 2.05.3(3)-28, Map 3 <br />Attachment 2.05.3(3)-35 <br />Map 2.05.3(3)-35 <br />Ponds 007 and 008 are the only ponds that will remain after reclamation. Pond 013 will remain <br />for some time after the reclamation of the surrounding land but will not be permanent. The <br />demonstration to allow retention of Pond 007 is Attachment 2.05.3(3)-16. The demonstration to <br />allow retention of Pond 008 is Attachment 2.05.3(3)-19. Map 2.05.3(3)-1 shows the locations of <br />all ponds. Pond 014 was the post -mine conversion of the pre -mine SAE #2. It was reclaimed <br />Section 2.05.3(3) Page 11 April 2017 (MR -104) <br />